Latest Tender Detail from uttar pradesh cooperative sugar factories federation ltd UPCSFFL for the corrigendum tender for erection and fabrication work a 1 , erection and fabrication work a 2 , erection and fabrication work a 3 , erection and fabrication work a 4 , erection and fabrication work a 5 , erection and fabrication work a 6 , erection and fabrication work a 7 , erection and fabrication work a 8 , erection and fabrication work a 9 , erection and fabrication work a 10 , erection and fabrication work a 11 , erection and fabrication work a 12 , erection and fabrication work a 13 , erection and fabrication work a 14 , erection and fabrication work a 15 , erection and fabrication work a 16 , erection and fabrication work a 17 , erection and fabrication work a 18 , erection and fabrication work a 19 , erection and fabrication work a 20 , erection and fabrication work a 21 , erection and fabrication work a 22 , erection and fabrication work a 23 , erection and fabrication work a 24 , erection and fabrication work a 25 , erection and fabrication work a 26 , erection and fabrication work a 27 , erection and fabrication work a 28 , erection and fabrication work a 29 , erection and fabrication work a 30 , erection and fabrication work a 31 , erection and fabrication work a 32 , erection and fabrication work a 33 , erection and fabrication work a 34 , erection and fabrication work a 35 , erection and fabrication work a 36 , erection and fabrication work a 37 , erection and fabrication work a 38 , erection and fabrication work a 39 , erection and fabrication work a 40 , erection and fabrication work a 41 , erection and fabrication work a 42 , erection and fabrication work a 43 , erection and fabrication work a 44 , erection and fabrication work a 45 , erection and fabrication work a 46 , erection and fabrication work a 47 , erection and fabrication work a 48 , erection and fabrication work a 49 , erection and fabrication work a 50 , erection and fabrication work a 51 , erection and fabrication work a 52 , erection and fabrication work a 53 , erection and fabrication work a 54 , erection and fabrication work a 55 , erection and fabrication work a 56 , erection and fabrication work a 57 , erection and fabrication work a 58 , erection and fabrication work a 59 , erection and fabrication work a 60 , erection and fabrication work a 61 , erection and fabrication work a 62 , erection and fabrication work a 63 , erection and fabrication work a 64 , erection and fabrication work a 65 , erection and fabrication work a 66, erection and fabrication work a, cut out and remove the weakened and worn-out portions of the discharge chute of the mill scraper. fabricate new sections using 12 mm thick plates, reinstall them, and provide perforated plates as per the scraper profile. weld and fix them securely, then conduct a satisfactory trial. remove the worn-out runner base of the cane carrier. fabricate a new runner base using a 100 mm channel box, installation it, and straighten, reverse, and reinstall the old channel. remove the worn 40/50 mm square bars of the cane unloader and replace them with new square bars of the same size. conduct a satisfactory trial. remove the worn runners of the cane carrier, rake carrier, bagasse elevator, and r.b.c. replace them by reversing the old runners or installing new runners as required. remove the worn or damaged side plates of the chains of the cane carrier, rake carrier, and r.b.c. replace them with repaired old plates or new plates. remove the worn side plates of the fibrizer hood. installation new plates, weld them from both inside and outside, and conduct a satisfactory trial. carry out complete overhauling, testing, and trial of the bagasse baling machine. perform the required repairs on the old racks of the s.r.c. and i.r.c. fabricate new racks for the bagasse elevator/r.b.c. chains as per the sample. fabricate and installation new top and bottom covers of the t.r.p.f. as per the existing design and conduct a satisfactory trial. remove the worn tail-end boots of the s.r.c./i.r.c. fabricate new boots from 8 mm/10 mm thick plates as per the sample, installation them, carry out leak-proof welding, and conduct a satisfactory trial. dismantle the grabs of the cane unloaders, repair all parts, perform hardfacing on the fingers as instructed, reassemble the grabs, and conduct a satisfactory trial. remove the damaged juice tray used for compound imbibition in the mills. fabricate and installation a new tray as per the sample and reconnect all fittings. remove the worn guides provided to prevent the chains of the cane carrier, s.r.c., i.r.c., and bagasse elevator from lifting. fabricate and installation new guides as instructed and conduct a satisfactory trial. repair the worn wheels of the bridge/trolley drive of the cane unloaders by welding as instructed. remove the damaged twin chutes of the t.r.p.f. fabricate new twin chutes matching the existing design and erect them in position. fabricate and fit m.s. rings on the idler wheels of the cane carrier. provide a 25 mm thick plate support between the mill headstock and the t.r.p.f. headstock as instructed. repair the old hammer shanks of the fibrizer by welding, hardfacing, and balancing. remove the damaged hoods of the cane chopper/leveller. fabricate and installation new folding-type hoods. replace the broken pocket plates of the pocket-type anvil plate of the fibrizer with new plates. straighten bent plates, weld them, and perform hardfacing as instructed. build up the worn hub surfaces of the cane leveller/chopper rotor assembly by welding, machine them flat, and perform hardfacing. remove the weakened motor and gearbox beds of the cane unloaders. fabricate modified new beds, installation them, align the motor and gearbox, and conduct a trial. strengthen the weakened columns of the cane carrier structure by welding reinforcing plates. fabricate and fit juice rings in the mill rollers as per the sample. carry out the required repairs to the pressure chutes between the t.r.p.f. and the mill. remove the damaged mill juice receiving tank. fabricate a new tank using 8 mm/10 mm thick plates, installation it, reconnect all connections, and conduct a leak-proof trial. remove the damaged bottom cone of the mill juice receiving tank. fabricate and installation a new cone as per the sample, reconnect all fittings, and conduct a leak-proof trial. remove the damaged 10"/12" pipes between the mill juice tray and the gutter. fabricate and installation new stainless steel pipes and conduct a leak-proof trial. provide 3 mm thick stainless steel lining in the bottom trough of the s.r.c./i.r.c. with leak-proof welding. remove the loose bed of boiler feed pump no. 1, fabricate and installation a new bed, reconnect all fittings, and conduct a trial. fabricate a leak-proof damper in the old i.d. fan ducting before the chimney so that there is no backflow of air when the new i.d. fan operates. remove the nipple reducers and damaged pipelines of all three wet scrubber pumps. installation new pipelines and carry out leak-proof welding. remove all nozzles inside the wet scrubber venturi, replace damaged nozzles with new ones, and reconnect all fittings. fabricate a new backwash pipeline from old boiler tubes between the service tank and wet scrubber. installation new valves, clamps, and complete all connections. remove the damaged juice tray below the t.r.p.f. leading to the mill juice tray. fabricate and installation a new tray. remove damaged ash chutes of the boilers. fabricate new chutes from old/new plates matching the original design and installation them. repair the damaged dampers of air heaters, economizers, and f.d./i.d. fan inlet, outlet, suction, and delivery ducts. fabricate new frames and fit new mesh/screens for the internal steam filters of the boiler drums. remove the damaged flue gas ducting between the i.d. fans and chimney. fabricate and installation new ducting from 5–6 mm thick plates and conduct a leak-proof trial. fabricate new impellers for the bagassilo fan as per the sample, repair the casing, and conduct a successful trial. remove the damaged suction cones of the i.d./f.d. fan casings. fabricate and installation new cones as per the sample and conduct a satisfactory trial. replace the damaged perforated baffle plates inside the boiler feed tank. remove and repair the damaged bagasse feeding chutes of boilers 1, 2, and 3. replace the damaged air headers supplying additional f.d. air to the furnaces of 20-ton boilers 1 and 2. replace the damaged ducting between the air heater and i.d. fan with new ducting made from 5–6 mm thick plates. replace damaged perforated screens used for bagasse filtration in the bagasse elevator. remove the economizer coils/tubes of 20-ton boilers 1 and 2, clean them internally and externally, conduct hydraulic testing, reinstall them, make them leak-proof, and carry out final hydraulic testing. remove damaged trough channels/plates of the s.r.c./i.r.c., fabricate replacements as instructed, and installation them. fabricate and installation angle iron strengthening rings on the boiler chimney. strengthen the damaged truss-type bridge structure of the cane unloader using new channels, angles, and plates. weld and restore the enlarged holes of the block-type chain links of the s.r.c./i.r.c., redrill pin holes, and grind the surfaces smooth. replace the worn rack attachment links of the s.r.c./i.r.c. chains with new 12 mm thick plate attachments, weld them, and drill holes as per the drawing. construct separate access platforms for all three cane unloaders using old angle channels. replace the damaged portions of the i.d. fan casing, air heater cell/ducting, and economizer cell. replace the old m.s. plates of the s.r.c./i.r.c. trough and boot, make them leak-proof, and provide 3 mm stainless steel lining. fabricate new racks for the s.r.c./i.r.c. chains from 25 mm thick plates, drill holes, and provide roller supports at both ends. remove the bent 250 mm channel of the cane unloader trolley, restore line and level, strengthen the structure, fit a new runner square bar, check diagonals, and align the wheels. dismantle all four wheels of the mill and powerhouse cranes, clean them, inspect bearings, grease all plumber blocks, replace damaged bearings from mill spares, repair worn wheels by welding, and conduct a satisfactory trial. repair the worn shells and teeth of the t.r.p.f. top and bottom rollers by hardfacing. fit rings on both sides to compensate for reduced shell length. remove the damaged mill juice tray and fabricate a new tray using 5 mm stainless steel plate as per the sample. conduct a leak-proof trial. repair the stainless steel juice tray of the mill. remove the mill headstock if cracked or misaligned, re-grout it, realign it, and complete all associated works. remove the shaft of the damaged t.r.p.f. roller and dismantle the shell using gas cutting. cut old 63.5 mm boiler tubes with bends, prepare 5.1-meter straight tubes for the air heater, and clean them by grinding. in muzaffarnagar, uttar pradesh,. Reference number 16211132. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!
Looking For Complete Tender Bidding Consultancy? Our Technical Experts Will Help You Prepare And Submit Your Tender Successfully.