tender for safe carriage of 8.5 m pcc pole , safe carriage of 11 and 13 m stp , safe carriage of 9 m stp , safe carriage of line material , opening binding dog raccon rabbit conductor , opening binding weseal conductor gi wire , opening binding of ab cable , erection of 8.5 m pcc as single support , erection of 9 m stp as single support , erection of 11 and 13 m stp as single support , erecton of 8.5 m pcc double section pole , erecton of 9 m stp double section pole , laying stringing dog raccon rabbit , laying stringing acsr weseal gi wire , laying stringing ab cable , straightening of tilted pcc stp single support , straightening of tilted double pole , opening of ht lt 25 kva 63 kva tf connection , opening of ht lt 100 kva tf connection , dismantelling of old material , re sagging of ht lt conductor , re sagging of ab cable , replacement of brocken damaged accessories , retightening of stay rod , providing and fixing of stay rod , earthing of pcc rs joist stp , carriage of old material , mounting of 25 kva 63 kva tf , mounting of 100 kva tf , chopping of tree branches , repairing resagging new guarding ht line, replacement of conductor poles and associated work in daviya aapda edsd jaithra, safe carriage of 8.5 mtr. long pcc pole from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 11/13 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 9 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of line material from store center etah/nearest substation to pit site in distance range 0 to 60 km. including loading & unloading at both ends., opening of binding & removal of dog/ raccoon/ rabbit conductor with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of acsr weasel conductor/ gi wire with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x95+1x35+1x16/3x50mm with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x120+1x70+1x16 with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., erection of 8.5 mtr. long pcc poles as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 9 mtr. stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 11/13 mtr.stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 8.5 mtr. long pcc poles as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., erection of 11mtr. stp as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with dog/ raccoon/ rabbit conductor including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with acsr weasel conductor/ gi wire including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x95 mm/3x50 mm. including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x120+1x70+1x16 including binding & nozzling., straightening of tilted pcc poles/stp/rail single support of ht/lt line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line., straightening of tilted d/p after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete., opening of ht/lt connections & lowering of 25/63 kva t/f from d/p/plinth and shifting up to in safer place., opening of ht/lt connections & lowering of 100 kva t/f from d/p/plinth and shifting up to in safer place., dismanteling of old/damage stp/rs joist of ht/lt line and carriage to store centre etah, re-sagging of dog/ raccoon/ rabbit conductor loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of acsr weasel conductor/ gi wire loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of abc 3x120+1x70+1x16 loose 33/ht/lt cable after opening, binding, nozzling etc., re-sagging of abc 3x50/3x95 loose 33/ht/lt cable after opening, binding, nozzling etc., replacement of 11 kv cross arms v type broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv disc insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of cross arms holding clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of f clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of lt shackle insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv cross arm broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., retightening of stay rod. etc. complete., providing fixing of stay rod with nuzzling etc. complete., earthing of pcc/rs joist/stp as per respo norms., carriage of old material from pit site to je store/store center, etah in distance range 0 to 10 km including loading & unloading and proper stacking., mounting of 25/63 kva t/f on double pole/plinth including making of the connection etc complete., mounting of 100 kva t/f on double pole/plinth including making of the connection etc complete., chopping of tree branches, repairing/ resagging / new guarding of ht lines with gi wire as per respo norms

Latest Tender Detail from uttar pradesh power corporation limited UPPCL for the tender for safe carriage of 8.5 m pcc pole , safe carriage of 11 and 13 m stp , safe carriage of 9 m stp , safe carriage of line material , opening binding dog raccon rabbit conductor , opening binding weseal conductor gi wire , opening binding of ab cable , erection of 8.5 m pcc as single support , erection of 9 m stp as single support , erection of 11 and 13 m stp as single support , erecton of 8.5 m pcc double section pole , erecton of 9 m stp double section pole , laying stringing dog raccon rabbit , laying stringing acsr weseal gi wire , laying stringing ab cable , straightening of tilted pcc stp single support , straightening of tilted double pole , opening of ht lt 25 kva 63 kva tf connection , opening of ht lt 100 kva tf connection , dismantelling of old material , re sagging of ht lt conductor , re sagging of ab cable , replacement of brocken damaged accessories , retightening of stay rod , providing and fixing of stay rod , earthing of pcc rs joist stp , carriage of old material , mounting of 25 kva 63 kva tf , mounting of 100 kva tf , chopping of tree branches , repairing resagging new guarding ht line, replacement of conductor poles and associated work in daviya aapda edsd jaithra, safe carriage of 8.5 mtr. long pcc pole from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 11/13 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 9 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of line material from store center etah/nearest substation to pit site in distance range 0 to 60 km. including loading & unloading at both ends., opening of binding & removal of dog/ raccoon/ rabbit conductor with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of acsr weasel conductor/ gi wire with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x95+1x35+1x16/3x50mm with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x120+1x70+1x16 with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., erection of 8.5 mtr. long pcc poles as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 9 mtr. stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 11/13 mtr.stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 8.5 mtr. long pcc poles as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., erection of 11mtr. stp as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with dog/ raccoon/ rabbit conductor including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with acsr weasel conductor/ gi wire including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x95 mm/3x50 mm. including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x120+1x70+1x16 including binding & nozzling., straightening of tilted pcc poles/stp/rail single support of ht/lt line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line., straightening of tilted d/p after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete., opening of ht/lt connections & lowering of 25/63 kva t/f from d/p/plinth and shifting up to in safer place., opening of ht/lt connections & lowering of 100 kva t/f from d/p/plinth and shifting up to in safer place., dismanteling of old/damage stp/rs joist of ht/lt line and carriage to store centre etah, re-sagging of dog/ raccoon/ rabbit conductor loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of acsr weasel conductor/ gi wire loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of abc 3x120+1x70+1x16 loose 33/ht/lt cable after opening, binding, nozzling etc., re-sagging of abc 3x50/3x95 loose 33/ht/lt cable after opening, binding, nozzling etc., replacement of 11 kv cross arms v type broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv disc insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of cross arms holding clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of f clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of lt shackle insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv cross arm broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., retightening of stay rod. etc. complete., providing fixing of stay rod with nuzzling etc. complete., earthing of pcc/rs joist/stp as per respo norms., carriage of old material from pit site to je store/store center, etah in distance range 0 to 10 km including loading & unloading and proper stacking., mounting of 25/63 kva t/f on double pole/plinth including making of the connection etc complete., mounting of 100 kva t/f on double pole/plinth including making of the connection etc complete., chopping of tree branches, repairing/ resagging / new guarding of ht lines with gi wire as per respo norms in etah, uttar pradesh,. Reference number 15688564. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!

T18 Ref No:15688564
Tender ID:GEM/2026/B/7629779
Tender Agency:uttar pradesh power corporation limited UPPCL
City:etah
State:uttar pradesh
Tender Related Keywords :unloading, stacking, drilling, clamps, wire, nut
Description :total quantity = 5055 ----- document required from seller = experience criteria,past performance,bidder turnover,oem annual turnover ----- evaluation method = total value wise evaluation
Tender Value:500000
Tender EMD:Refer Document
Tender Fee:Refer Document
Published Date:Jun 05, 2026
Due Date:Jun 22, 2026
Tender Opening Date:Jun 22, 2026
Tender DocumentsDownload Document
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

This Government Tender has been Published  by Uttar pradesh power corporation limited UPPCL for work related to unloading,stacking,drilling,clamps,wire,nut in Etah, Uttar pradesh. The Tender work is tender for safe carriage of 8.5 m pcc pole , safe carriage of 11 and 13 m stp , safe carriage of 9 m stp , safe carriage of line material , opening binding dog raccon rabbit conductor , opening binding weseal conductor gi wire , opening binding of ab cable , erection of 8.5 m pcc as single support , erection of 9 m stp as single support , erection of 11 and 13 m stp as single support , erecton of 8.5 m pcc double section pole , erecton of 9 m stp double section pole , laying stringing dog raccon rabbit , laying stringing acsr weseal gi wire , laying stringing ab cable , straightening of tilted pcc stp single support , straightening of tilted double pole , opening of ht lt 25 kva 63 kva tf connection , opening of ht lt 100 kva tf connection , dismantelling of old material , re sagging of ht lt conductor , re sagging of ab cable , replacement of brocken damaged accessories , retightening of stay rod , providing and fixing of stay rod , earthing of pcc rs joist stp , carriage of old material , mounting of 25 kva 63 kva tf , mounting of 100 kva tf , chopping of tree branches , repairing resagging new guarding ht line, replacement of conductor poles and associated work in daviya aapda edsd jaithra, safe carriage of 8.5 mtr. long pcc pole from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 11/13 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 9 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of line material from store center etah/nearest substation to pit site in distance range 0 to 60 km. including loading & unloading at both ends., opening of binding & removal of dog/ raccoon/ rabbit conductor with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of acsr weasel conductor/ gi wire with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x95+1x35+1x16/3x50mm with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x120+1x70+1x16 with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., erection of 8.5 mtr. long pcc poles as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 9 mtr. stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 11/13 mtr.stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 8.5 mtr. long pcc poles as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., erection of 11mtr. stp as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with dog/ raccoon/ rabbit conductor including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with acsr weasel conductor/ gi wire including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x95 mm/3x50 mm. including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x120+1x70+1x16 including binding & nozzling., straightening of tilted pcc poles/stp/rail single support of ht/lt line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line., straightening of tilted d/p after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete., opening of ht/lt connections & lowering of 25/63 kva t/f from d/p/plinth and shifting up to in safer place., opening of ht/lt connections & lowering of 100 kva t/f from d/p/plinth and shifting up to in safer place., dismanteling of old/damage stp/rs joist of ht/lt line and carriage to store centre etah, re-sagging of dog/ raccoon/ rabbit conductor loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of acsr weasel conductor/ gi wire loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of abc 3x120+1x70+1x16 loose 33/ht/lt cable after opening, binding, nozzling etc., re-sagging of abc 3x50/3x95 loose 33/ht/lt cable after opening, binding, nozzling etc., replacement of 11 kv cross arms v type broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv disc insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of cross arms holding clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of f clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of lt shackle insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv cross arm broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., retightening of stay rod. etc. complete., providing fixing of stay rod with nuzzling etc. complete., earthing of pcc/rs joist/stp as per respo norms., carriage of old material from pit site to je store/store center, etah in distance range 0 to 10 km including loading & unloading and proper stacking., mounting of 25/63 kva t/f on double pole/plinth including making of the connection etc complete., mounting of 100 kva t/f on double pole/plinth including making of the connection etc complete., chopping of tree branches, repairing/ resagging / new guarding of ht lines with gi wire as per respo norms. Tender18 Provide this type Government Tender Information on daily basis.


This tender invites eligible contractors, suppliers, manufacturers, consultants, Startups, Msmes, traders and service providers to submit bids for the specified project, supply, service, or work requirement.


Before applying, interested bidders should review the tender scope, eligibility criteria, estimated contract value, important dates, technical requirements, reqired docuent list for bidder and bid submission instructions as per provided in the official tender documents. 


This Verified Information Provide By Tender18 in this page so Bidder Can Easiy  Understanding tender  requirements and bidders can prepare a compliant and competitive tender proposal.

To participate in the tender for safe carriage of 8.5 m pcc pole , safe carriage of 11 and 13 m stp , safe carriage of 9 m stp , safe carriage of line material , opening binding dog raccon rabbit conductor , opening binding weseal conductor gi wire , opening binding of ab cable , erection of 8.5 m pcc as single support , erection of 9 m stp as single support , erection of 11 and 13 m stp as single support , erecton of 8.5 m pcc double section pole , erecton of 9 m stp double section pole , laying stringing dog raccon rabbit , laying stringing acsr weseal gi wire , laying stringing ab cable , straightening of tilted pcc stp single support , straightening of tilted double pole , opening of ht lt 25 kva 63 kva tf connection , opening of ht lt 100 kva tf connection , dismantelling of old material , re sagging of ht lt conductor , re sagging of ab cable , replacement of brocken damaged accessories , retightening of stay rod , providing and fixing of stay rod , earthing of pcc rs joist stp , carriage of old material , mounting of 25 kva 63 kva tf , mounting of 100 kva tf , chopping of tree branches , repairing resagging new guarding ht line, replacement of conductor poles and associated work in daviya aapda edsd jaithra, safe carriage of 8.5 mtr. long pcc pole from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 11/13 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 9 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of line material from store center etah/nearest substation to pit site in distance range 0 to 60 km. including loading & unloading at both ends., opening of binding & removal of dog/ raccoon/ rabbit conductor with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of acsr weasel conductor/ gi wire with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x95+1x35+1x16/3x50mm with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x120+1x70+1x16 with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., erection of 8.5 mtr. long pcc poles as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 9 mtr. stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 11/13 mtr.stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 8.5 mtr. long pcc poles as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., erection of 11mtr. stp as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with dog/ raccoon/ rabbit conductor including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with acsr weasel conductor/ gi wire including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x95 mm/3x50 mm. including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x120+1x70+1x16 including binding & nozzling., straightening of tilted pcc poles/stp/rail single support of ht/lt line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line., straightening of tilted d/p after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete., opening of ht/lt connections & lowering of 25/63 kva t/f from d/p/plinth and shifting up to in safer place., opening of ht/lt connections & lowering of 100 kva t/f from d/p/plinth and shifting up to in safer place., dismanteling of old/damage stp/rs joist of ht/lt line and carriage to store centre etah, re-sagging of dog/ raccoon/ rabbit conductor loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of acsr weasel conductor/ gi wire loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of abc 3x120+1x70+1x16 loose 33/ht/lt cable after opening, binding, nozzling etc., re-sagging of abc 3x50/3x95 loose 33/ht/lt cable after opening, binding, nozzling etc., replacement of 11 kv cross arms v type broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv disc insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of cross arms holding clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of f clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of lt shackle insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv cross arm broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., retightening of stay rod. etc. complete., providing fixing of stay rod with nuzzling etc. complete., earthing of pcc/rs joist/stp as per respo norms., carriage of old material from pit site to je store/store center, etah in distance range 0 to 10 km including loading & unloading and proper stacking., mounting of 25/63 kva t/f on double pole/plinth including making of the connection etc complete., mounting of 100 kva t/f on double pole/plinth including making of the connection etc complete., chopping of tree branches, repairing/ resagging / new guarding of ht lines with gi wire as per respo norms, bidders should first download and review all available tender documents. These documents generally include the Notice Inviting Tender (NIT), Bill of Quantities (BOQ), technical specifications, eligibility criteria, scope of work, and bid submission instructions.


Tender Governemnt Authorities like Uttar pradesh power corporation limited UPPCL usually publish these documents on their official eProcurement portals, departmental tender portals, the GeM Tender Portal, or other government procurement platforms or on newspapre. Finding and accessing the correct tender documents across multiple portals can sometimes be time-consuming for bidders. 


To make the process easier, Tender18 provides quick access to the available tender documents related to this Etah , Uttar pradesh tender on a single page. Businesses involved in unloading,stacking,drilling,clamps,wire,nut related products, services, or works can conveniently download the relevant documents and review the tender requirements without spending time searching across different procurement portals.

The tender for safe carriage of 8.5 m pcc pole , safe carriage of 11 and 13 m stp , safe carriage of 9 m stp , safe carriage of line material , opening binding dog raccon rabbit conductor , opening binding weseal conductor gi wire , opening binding of ab cable , erection of 8.5 m pcc as single support , erection of 9 m stp as single support , erection of 11 and 13 m stp as single support , erecton of 8.5 m pcc double section pole , erecton of 9 m stp double section pole , laying stringing dog raccon rabbit , laying stringing acsr weseal gi wire , laying stringing ab cable , straightening of tilted pcc stp single support , straightening of tilted double pole , opening of ht lt 25 kva 63 kva tf connection , opening of ht lt 100 kva tf connection , dismantelling of old material , re sagging of ht lt conductor , re sagging of ab cable , replacement of brocken damaged accessories , retightening of stay rod , providing and fixing of stay rod , earthing of pcc rs joist stp , carriage of old material , mounting of 25 kva 63 kva tf , mounting of 100 kva tf , chopping of tree branches , repairing resagging new guarding ht line, replacement of conductor poles and associated work in daviya aapda edsd jaithra, safe carriage of 8.5 mtr. long pcc pole from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 11/13 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 9 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of line material from store center etah/nearest substation to pit site in distance range 0 to 60 km. including loading & unloading at both ends., opening of binding & removal of dog/ raccoon/ rabbit conductor with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of acsr weasel conductor/ gi wire with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x95+1x35+1x16/3x50mm with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x120+1x70+1x16 with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., erection of 8.5 mtr. long pcc poles as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 9 mtr. stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 11/13 mtr.stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 8.5 mtr. long pcc poles as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., erection of 11mtr. stp as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with dog/ raccoon/ rabbit conductor including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with acsr weasel conductor/ gi wire including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x95 mm/3x50 mm. including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x120+1x70+1x16 including binding & nozzling., straightening of tilted pcc poles/stp/rail single support of ht/lt line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line., straightening of tilted d/p after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete., opening of ht/lt connections & lowering of 25/63 kva t/f from d/p/plinth and shifting up to in safer place., opening of ht/lt connections & lowering of 100 kva t/f from d/p/plinth and shifting up to in safer place., dismanteling of old/damage stp/rs joist of ht/lt line and carriage to store centre etah, re-sagging of dog/ raccoon/ rabbit conductor loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of acsr weasel conductor/ gi wire loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of abc 3x120+1x70+1x16 loose 33/ht/lt cable after opening, binding, nozzling etc., re-sagging of abc 3x50/3x95 loose 33/ht/lt cable after opening, binding, nozzling etc., replacement of 11 kv cross arms v type broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv disc insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of cross arms holding clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of f clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of lt shackle insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv cross arm broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., retightening of stay rod. etc. complete., providing fixing of stay rod with nuzzling etc. complete., earthing of pcc/rs joist/stp as per respo norms., carriage of old material from pit site to je store/store center, etah in distance range 0 to 10 km including loading & unloading and proper stacking., mounting of 25/63 kva t/f on double pole/plinth including making of the connection etc complete., mounting of 100 kva t/f on double pole/plinth including making of the connection etc complete., chopping of tree branches, repairing/ resagging / new guarding of ht lines with gi wire as per respo norms from Etah, Uttar pradesh may be relevant for contractors, suppliers, vendors, manufacturers, consultants, service providers, startups, MSMEs, and other organizations involved in unloading,stacking,drilling,clamps,wire,nut related products, services, or works. However, eligibility to participate depends on the qualification criteria specified by Uttar pradesh power corporation limited UPPCL in the official tender documents.

Before submitting a bid, interested applicants should carefully review the eligibility conditions, technical requirements, financial criteria, work experience requirements, annual turnover conditions, registrations, certifications, and any other supporting documents required by the tendering authority. The detailed qualification requirements and bidder eligibility criteria are available in the tender notice and related documents provided on this page. 

Ensuring compliance with all eligibility and qualification requirements before bid submission can help bidders avoid disqualification and improve their chances of successful participation in the tender process.

Tende18 provides comprehensive tender bidding services, including a complete tender summary along with a detailed analysis of the Tender Qualification and Eligibility Criteria.

Interested in participating in the tender for safe carriage of 8.5 m pcc pole , safe carriage of 11 and 13 m stp , safe carriage of 9 m stp , safe carriage of line material , opening binding dog raccon rabbit conductor , opening binding weseal conductor gi wire , opening binding of ab cable , erection of 8.5 m pcc as single support , erection of 9 m stp as single support , erection of 11 and 13 m stp as single support , erecton of 8.5 m pcc double section pole , erecton of 9 m stp double section pole , laying stringing dog raccon rabbit , laying stringing acsr weseal gi wire , laying stringing ab cable , straightening of tilted pcc stp single support , straightening of tilted double pole , opening of ht lt 25 kva 63 kva tf connection , opening of ht lt 100 kva tf connection , dismantelling of old material , re sagging of ht lt conductor , re sagging of ab cable , replacement of brocken damaged accessories , retightening of stay rod , providing and fixing of stay rod , earthing of pcc rs joist stp , carriage of old material , mounting of 25 kva 63 kva tf , mounting of 100 kva tf , chopping of tree branches , repairing resagging new guarding ht line, replacement of conductor poles and associated work in daviya aapda edsd jaithra, safe carriage of 8.5 mtr. long pcc pole from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 11/13 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 9 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of line material from store center etah/nearest substation to pit site in distance range 0 to 60 km. including loading & unloading at both ends., opening of binding & removal of dog/ raccoon/ rabbit conductor with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of acsr weasel conductor/ gi wire with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x95+1x35+1x16/3x50mm with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x120+1x70+1x16 with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., erection of 8.5 mtr. long pcc poles as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 9 mtr. stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 11/13 mtr.stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 8.5 mtr. long pcc poles as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., erection of 11mtr. stp as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with dog/ raccoon/ rabbit conductor including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with acsr weasel conductor/ gi wire including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x95 mm/3x50 mm. including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x120+1x70+1x16 including binding & nozzling., straightening of tilted pcc poles/stp/rail single support of ht/lt line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line., straightening of tilted d/p after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete., opening of ht/lt connections & lowering of 25/63 kva t/f from d/p/plinth and shifting up to in safer place., opening of ht/lt connections & lowering of 100 kva t/f from d/p/plinth and shifting up to in safer place., dismanteling of old/damage stp/rs joist of ht/lt line and carriage to store centre etah, re-sagging of dog/ raccoon/ rabbit conductor loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of acsr weasel conductor/ gi wire loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of abc 3x120+1x70+1x16 loose 33/ht/lt cable after opening, binding, nozzling etc., re-sagging of abc 3x50/3x95 loose 33/ht/lt cable after opening, binding, nozzling etc., replacement of 11 kv cross arms v type broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv disc insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of cross arms holding clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of f clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of lt shackle insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv cross arm broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., retightening of stay rod. etc. complete., providing fixing of stay rod with nuzzling etc. complete., earthing of pcc/rs joist/stp as per respo norms., carriage of old material from pit site to je store/store center, etah in distance range 0 to 10 km including loading & unloading and proper stacking., mounting of 25/63 kva t/f on double pole/plinth including making of the connection etc complete., mounting of 100 kva t/f on double pole/plinth including making of the connection etc complete., chopping of tree branches, repairing/ resagging / new guarding of ht lines with gi wire as per respo norms issued by Uttar pradesh power corporation limited UPPCL for unloading,stacking,drilling,clamps,wire,nut related work in Etah, Uttar pradesh? TENDER18 provides complete assistance to help businesses understand tender requirements, access tender documents, review eligibility criteria, qualification requirements, important dates, and bid submission guidelines associated with this tender.

Our Tender18 Expert Technical team can assist with vendor and GeM registration on the relevant departmental, eProcurement, GeM, or government tender portal, preparation of technical and financial bid documents, compliance with qualification criteria, document verification, and complete online tender submission support. Whether you are a contractor, supplier, manufacturer, consultant, startup, or MSME working in the field of unloading,stacking,drilling,clamps,wire,nut, Tender18 can help simplify the tender participation process and support you throughout every stage of bidding for this tender. so that tender18 is one the top leading tender consultant in Inda.

1.

Whom should I contact if I have further queries about the Tender scope?

You can fill out the integrated inquiry form below on this detail page to share your company profile. Our consultancy desk will review your query regarding unloading,stacking,drilling,clamps,wire,nut parameters and guide you on how to coordinate efficiently with the procurement team of Uttar pradesh power corporation limited UPPCL

2.

How can Tender18 assist my business in winning this government contract?

Tender18 provides end-to-end professional bidding support and documentation advisory for tender for safe carriage of 8.5 m pcc pole , safe carriage of 11 and 13 m stp , safe carriage of 9 m stp , safe carriage of line material , opening binding dog raccon rabbit conductor , opening binding weseal conductor gi wire , opening binding of ab cable , erection of 8.5 m pcc as single support , erection of 9 m stp as single support , erection of 11 and 13 m stp as single support , erecton of 8.5 m pcc double section pole , erecton of 9 m stp double section pole , laying stringing dog raccon rabbit , laying stringing acsr weseal gi wire , laying stringing ab cable , straightening of tilted pcc stp single support , straightening of tilted double pole , opening of ht lt 25 kva 63 kva tf connection , opening of ht lt 100 kva tf connection , dismantelling of old material , re sagging of ht lt conductor , re sagging of ab cable , replacement of brocken damaged accessories , retightening of stay rod , providing and fixing of stay rod , earthing of pcc rs joist stp , carriage of old material , mounting of 25 kva 63 kva tf , mounting of 100 kva tf , chopping of tree branches , repairing resagging new guarding ht line, replacement of conductor poles and associated work in daviya aapda edsd jaithra, safe carriage of 8.5 mtr. long pcc pole from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 11/13 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 9 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of line material from store center etah/nearest substation to pit site in distance range 0 to 60 km. including loading & unloading at both ends., opening of binding & removal of dog/ raccoon/ rabbit conductor with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of acsr weasel conductor/ gi wire with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x95+1x35+1x16/3x50mm with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x120+1x70+1x16 with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., erection of 8.5 mtr. long pcc poles as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 9 mtr. stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 11/13 mtr.stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 8.5 mtr. long pcc poles as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., erection of 11mtr. stp as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with dog/ raccoon/ rabbit conductor including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with acsr weasel conductor/ gi wire including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x95 mm/3x50 mm. including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x120+1x70+1x16 including binding & nozzling., straightening of tilted pcc poles/stp/rail single support of ht/lt line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line., straightening of tilted d/p after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete., opening of ht/lt connections & lowering of 25/63 kva t/f from d/p/plinth and shifting up to in safer place., opening of ht/lt connections & lowering of 100 kva t/f from d/p/plinth and shifting up to in safer place., dismanteling of old/damage stp/rs joist of ht/lt line and carriage to store centre etah, re-sagging of dog/ raccoon/ rabbit conductor loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of acsr weasel conductor/ gi wire loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of abc 3x120+1x70+1x16 loose 33/ht/lt cable after opening, binding, nozzling etc., re-sagging of abc 3x50/3x95 loose 33/ht/lt cable after opening, binding, nozzling etc., replacement of 11 kv cross arms v type broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv disc insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of cross arms holding clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of f clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of lt shackle insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv cross arm broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., retightening of stay rod. etc. complete., providing fixing of stay rod with nuzzling etc. complete., earthing of pcc/rs joist/stp as per respo norms., carriage of old material from pit site to je store/store center, etah in distance range 0 to 10 km including loading & unloading and proper stacking., mounting of 25/63 kva t/f on double pole/plinth including making of the connection etc complete., mounting of 100 kva t/f on double pole/plinth including making of the connection etc complete., chopping of tree branches, repairing/ resagging / new guarding of ht lines with gi wire as per respo norms . Our senior analysts help you decode the complete project guidelines, manage accurate costing sheets, and complete error-free submissions on the official platform used by Uttar pradesh power corporation limited UPPCL.

3.

What are the main reasons for a technical tender rejection?

Most online bids face rejection during the initial evaluation round due to avoidable errors like uploading blurred document scans, submitting expired DSCs, or missing critical experience papers required for tender for safe carriage of 8.5 m pcc pole , safe carriage of 11 and 13 m stp , safe carriage of 9 m stp , safe carriage of line material , opening binding dog raccon rabbit conductor , opening binding weseal conductor gi wire , opening binding of ab cable , erection of 8.5 m pcc as single support , erection of 9 m stp as single support , erection of 11 and 13 m stp as single support , erecton of 8.5 m pcc double section pole , erecton of 9 m stp double section pole , laying stringing dog raccon rabbit , laying stringing acsr weseal gi wire , laying stringing ab cable , straightening of tilted pcc stp single support , straightening of tilted double pole , opening of ht lt 25 kva 63 kva tf connection , opening of ht lt 100 kva tf connection , dismantelling of old material , re sagging of ht lt conductor , re sagging of ab cable , replacement of brocken damaged accessories , retightening of stay rod , providing and fixing of stay rod , earthing of pcc rs joist stp , carriage of old material , mounting of 25 kva 63 kva tf , mounting of 100 kva tf , chopping of tree branches , repairing resagging new guarding ht line, replacement of conductor poles and associated work in daviya aapda edsd jaithra, safe carriage of 8.5 mtr. long pcc pole from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 11/13 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 9 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of line material from store center etah/nearest substation to pit site in distance range 0 to 60 km. including loading & unloading at both ends., opening of binding & removal of dog/ raccoon/ rabbit conductor with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of acsr weasel conductor/ gi wire with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x95+1x35+1x16/3x50mm with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x120+1x70+1x16 with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., erection of 8.5 mtr. long pcc poles as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 9 mtr. stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 11/13 mtr.stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 8.5 mtr. long pcc poles as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., erection of 11mtr. stp as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with dog/ raccoon/ rabbit conductor including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with acsr weasel conductor/ gi wire including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x95 mm/3x50 mm. including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x120+1x70+1x16 including binding & nozzling., straightening of tilted pcc poles/stp/rail single support of ht/lt line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line., straightening of tilted d/p after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete., opening of ht/lt connections & lowering of 25/63 kva t/f from d/p/plinth and shifting up to in safer place., opening of ht/lt connections & lowering of 100 kva t/f from d/p/plinth and shifting up to in safer place., dismanteling of old/damage stp/rs joist of ht/lt line and carriage to store centre etah, re-sagging of dog/ raccoon/ rabbit conductor loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of acsr weasel conductor/ gi wire loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of abc 3x120+1x70+1x16 loose 33/ht/lt cable after opening, binding, nozzling etc., re-sagging of abc 3x50/3x95 loose 33/ht/lt cable after opening, binding, nozzling etc., replacement of 11 kv cross arms v type broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv disc insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of cross arms holding clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of f clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of lt shackle insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv cross arm broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., retightening of stay rod. etc. complete., providing fixing of stay rod with nuzzling etc. complete., earthing of pcc/rs joist/stp as per respo norms., carriage of old material from pit site to je store/store center, etah in distance range 0 to 10 km including loading & unloading and proper stacking., mounting of 25/63 kva t/f on double pole/plinth including making of the connection etc complete., mounting of 100 kva t/f on double pole/plinth including making of the connection etc complete., chopping of tree branches, repairing/ resagging / new guarding of ht lines with gi wire as per respo norms in Uttar pradesh.

4.

Can contractors located outside the local region participate in this bid?

Eligibility for outstation bidders depends entirely on the terms set inside the document for tender for safe carriage of 8.5 m pcc pole , safe carriage of 11 and 13 m stp , safe carriage of 9 m stp , safe carriage of line material , opening binding dog raccon rabbit conductor , opening binding weseal conductor gi wire , opening binding of ab cable , erection of 8.5 m pcc as single support , erection of 9 m stp as single support , erection of 11 and 13 m stp as single support , erecton of 8.5 m pcc double section pole , erecton of 9 m stp double section pole , laying stringing dog raccon rabbit , laying stringing acsr weseal gi wire , laying stringing ab cable , straightening of tilted pcc stp single support , straightening of tilted double pole , opening of ht lt 25 kva 63 kva tf connection , opening of ht lt 100 kva tf connection , dismantelling of old material , re sagging of ht lt conductor , re sagging of ab cable , replacement of brocken damaged accessories , retightening of stay rod , providing and fixing of stay rod , earthing of pcc rs joist stp , carriage of old material , mounting of 25 kva 63 kva tf , mounting of 100 kva tf , chopping of tree branches , repairing resagging new guarding ht line, replacement of conductor poles and associated work in daviya aapda edsd jaithra, safe carriage of 8.5 mtr. long pcc pole from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 11/13 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 9 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of line material from store center etah/nearest substation to pit site in distance range 0 to 60 km. including loading & unloading at both ends., opening of binding & removal of dog/ raccoon/ rabbit conductor with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of acsr weasel conductor/ gi wire with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x95+1x35+1x16/3x50mm with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x120+1x70+1x16 with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., erection of 8.5 mtr. long pcc poles as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 9 mtr. stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 11/13 mtr.stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 8.5 mtr. long pcc poles as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., erection of 11mtr. stp as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with dog/ raccoon/ rabbit conductor including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with acsr weasel conductor/ gi wire including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x95 mm/3x50 mm. including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x120+1x70+1x16 including binding & nozzling., straightening of tilted pcc poles/stp/rail single support of ht/lt line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line., straightening of tilted d/p after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete., opening of ht/lt connections & lowering of 25/63 kva t/f from d/p/plinth and shifting up to in safer place., opening of ht/lt connections & lowering of 100 kva t/f from d/p/plinth and shifting up to in safer place., dismanteling of old/damage stp/rs joist of ht/lt line and carriage to store centre etah, re-sagging of dog/ raccoon/ rabbit conductor loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of acsr weasel conductor/ gi wire loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of abc 3x120+1x70+1x16 loose 33/ht/lt cable after opening, binding, nozzling etc., re-sagging of abc 3x50/3x95 loose 33/ht/lt cable after opening, binding, nozzling etc., replacement of 11 kv cross arms v type broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv disc insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of cross arms holding clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of f clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of lt shackle insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv cross arm broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., retightening of stay rod. etc. complete., providing fixing of stay rod with nuzzling etc. complete., earthing of pcc/rs joist/stp as per respo norms., carriage of old material from pit site to je store/store center, etah in distance range 0 to 10 km including loading & unloading and proper stacking., mounting of 25/63 kva t/f on double pole/plinth including making of the connection etc complete., mounting of 100 kva t/f on double pole/plinth including making of the connection etc complete., chopping of tree branches, repairing/ resagging / new guarding of ht lines with gi wire as per respo norms. While many public sector projects allow national competitive bidding, certain localized works require local offices or specific registration metrics in Etah.

5.

Do I need an active GeM Portal registration to apply for this work?

If this procurement is routed through the central marketplace, an active GeM Seller ID is mandatory to supply unloading,stacking,drilling,clamps,wire,nut items. Tender18 offers complete assistance for brand cataloging, profile creation, and vendor assessment required officially by Uttar pradesh power corporation limited UPPCL

6.

What are the primary legal documents required to submit a valid bid?

To register an eligible bid for these unloading,stacking,drilling,clamps,wire,nut contracts, companies must prepare their core compliance documents. Vendors operating across Uttar pradesh must ensure they possess a valid GST registration, permanent account number (PAN), and active Class-3 Digital Signature Certificates.

7.

What products or services are required for this active work?

This public procurement cycle is specifically looking for qualified vendors and suppliers who can provide high-quality unloading,stacking,drilling,clamps,wire,nut solutions. The operational execution, delivery, and deployment of these materials must be managed locally within the Etah region.

8.

Where can I review the estimated cost or budget details for this Tender?

The estimated project cost and budget thresholds can be reviewed directly inside the tender document. Bidders can analyze these qualification files to check if their firm meets the financial capability criteria specified for tender for safe carriage of 8.5 m pcc pole , safe carriage of 11 and 13 m stp , safe carriage of 9 m stp , safe carriage of line material , opening binding dog raccon rabbit conductor , opening binding weseal conductor gi wire , opening binding of ab cable , erection of 8.5 m pcc as single support , erection of 9 m stp as single support , erection of 11 and 13 m stp as single support , erecton of 8.5 m pcc double section pole , erecton of 9 m stp double section pole , laying stringing dog raccon rabbit , laying stringing acsr weseal gi wire , laying stringing ab cable , straightening of tilted pcc stp single support , straightening of tilted double pole , opening of ht lt 25 kva 63 kva tf connection , opening of ht lt 100 kva tf connection , dismantelling of old material , re sagging of ht lt conductor , re sagging of ab cable , replacement of brocken damaged accessories , retightening of stay rod , providing and fixing of stay rod , earthing of pcc rs joist stp , carriage of old material , mounting of 25 kva 63 kva tf , mounting of 100 kva tf , chopping of tree branches , repairing resagging new guarding ht line, replacement of conductor poles and associated work in daviya aapda edsd jaithra, safe carriage of 8.5 mtr. long pcc pole from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 11/13 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 9 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of line material from store center etah/nearest substation to pit site in distance range 0 to 60 km. including loading & unloading at both ends., opening of binding & removal of dog/ raccoon/ rabbit conductor with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of acsr weasel conductor/ gi wire with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x95+1x35+1x16/3x50mm with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x120+1x70+1x16 with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., erection of 8.5 mtr. long pcc poles as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 9 mtr. stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 11/13 mtr.stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 8.5 mtr. long pcc poles as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., erection of 11mtr. stp as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with dog/ raccoon/ rabbit conductor including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with acsr weasel conductor/ gi wire including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x95 mm/3x50 mm. including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x120+1x70+1x16 including binding & nozzling., straightening of tilted pcc poles/stp/rail single support of ht/lt line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line., straightening of tilted d/p after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete., opening of ht/lt connections & lowering of 25/63 kva t/f from d/p/plinth and shifting up to in safer place., opening of ht/lt connections & lowering of 100 kva t/f from d/p/plinth and shifting up to in safer place., dismanteling of old/damage stp/rs joist of ht/lt line and carriage to store centre etah, re-sagging of dog/ raccoon/ rabbit conductor loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of acsr weasel conductor/ gi wire loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of abc 3x120+1x70+1x16 loose 33/ht/lt cable after opening, binding, nozzling etc., re-sagging of abc 3x50/3x95 loose 33/ht/lt cable after opening, binding, nozzling etc., replacement of 11 kv cross arms v type broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv disc insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of cross arms holding clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of f clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of lt shackle insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv cross arm broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., retightening of stay rod. etc. complete., providing fixing of stay rod with nuzzling etc. complete., earthing of pcc/rs joist/stp as per respo norms., carriage of old material from pit site to je store/store center, etah in distance range 0 to 10 km including loading & unloading and proper stacking., mounting of 25/63 kva t/f on double pole/plinth including making of the connection etc complete., mounting of 100 kva t/f on double pole/plinth including making of the connection etc complete., chopping of tree branches, repairing/ resagging / new guarding of ht lines with gi wire as per respo norms by Uttar pradesh power corporation limited UPPCL

9.

How can I download the official BOQ file for this opportunity?

You can download the commercial Bill of Quantities (BOQ) spreadsheet directly using the secure link provided on this page. The BOQ file contains the item descriptions and rate filling forms officially validated for tender for safe carriage of 8.5 m pcc pole , safe carriage of 11 and 13 m stp , safe carriage of 9 m stp , safe carriage of line material , opening binding dog raccon rabbit conductor , opening binding weseal conductor gi wire , opening binding of ab cable , erection of 8.5 m pcc as single support , erection of 9 m stp as single support , erection of 11 and 13 m stp as single support , erecton of 8.5 m pcc double section pole , erecton of 9 m stp double section pole , laying stringing dog raccon rabbit , laying stringing acsr weseal gi wire , laying stringing ab cable , straightening of tilted pcc stp single support , straightening of tilted double pole , opening of ht lt 25 kva 63 kva tf connection , opening of ht lt 100 kva tf connection , dismantelling of old material , re sagging of ht lt conductor , re sagging of ab cable , replacement of brocken damaged accessories , retightening of stay rod , providing and fixing of stay rod , earthing of pcc rs joist stp , carriage of old material , mounting of 25 kva 63 kva tf , mounting of 100 kva tf , chopping of tree branches , repairing resagging new guarding ht line, replacement of conductor poles and associated work in daviya aapda edsd jaithra, safe carriage of 8.5 mtr. long pcc pole from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 11/13 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 9 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of line material from store center etah/nearest substation to pit site in distance range 0 to 60 km. including loading & unloading at both ends., opening of binding & removal of dog/ raccoon/ rabbit conductor with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of acsr weasel conductor/ gi wire with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x95+1x35+1x16/3x50mm with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x120+1x70+1x16 with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., erection of 8.5 mtr. long pcc poles as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 9 mtr. stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 11/13 mtr.stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 8.5 mtr. long pcc poles as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., erection of 11mtr. stp as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with dog/ raccoon/ rabbit conductor including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with acsr weasel conductor/ gi wire including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x95 mm/3x50 mm. including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x120+1x70+1x16 including binding & nozzling., straightening of tilted pcc poles/stp/rail single support of ht/lt line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line., straightening of tilted d/p after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete., opening of ht/lt connections & lowering of 25/63 kva t/f from d/p/plinth and shifting up to in safer place., opening of ht/lt connections & lowering of 100 kva t/f from d/p/plinth and shifting up to in safer place., dismanteling of old/damage stp/rs joist of ht/lt line and carriage to store centre etah, re-sagging of dog/ raccoon/ rabbit conductor loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of acsr weasel conductor/ gi wire loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of abc 3x120+1x70+1x16 loose 33/ht/lt cable after opening, binding, nozzling etc., re-sagging of abc 3x50/3x95 loose 33/ht/lt cable after opening, binding, nozzling etc., replacement of 11 kv cross arms v type broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv disc insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of cross arms holding clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of f clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of lt shackle insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv cross arm broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., retightening of stay rod. etc. complete., providing fixing of stay rod with nuzzling etc. complete., earthing of pcc/rs joist/stp as per respo norms., carriage of old material from pit site to je store/store center, etah in distance range 0 to 10 km including loading & unloading and proper stacking., mounting of 25/63 kva t/f on double pole/plinth including making of the connection etc complete., mounting of 100 kva t/f on double pole/plinth including making of the connection etc complete., chopping of tree branches, repairing/ resagging / new guarding of ht lines with gi wire as per respo norms within the Uttar pradesh jurisdiction

10.

How can I find the submission closing date for this contract?

The official timeline and deadline details for tender for safe carriage of 8.5 m pcc pole , safe carriage of 11 and 13 m stp , safe carriage of 9 m stp , safe carriage of line material , opening binding dog raccon rabbit conductor , opening binding weseal conductor gi wire , opening binding of ab cable , erection of 8.5 m pcc as single support , erection of 9 m stp as single support , erection of 11 and 13 m stp as single support , erecton of 8.5 m pcc double section pole , erecton of 9 m stp double section pole , laying stringing dog raccon rabbit , laying stringing acsr weseal gi wire , laying stringing ab cable , straightening of tilted pcc stp single support , straightening of tilted double pole , opening of ht lt 25 kva 63 kva tf connection , opening of ht lt 100 kva tf connection , dismantelling of old material , re sagging of ht lt conductor , re sagging of ab cable , replacement of brocken damaged accessories , retightening of stay rod , providing and fixing of stay rod , earthing of pcc rs joist stp , carriage of old material , mounting of 25 kva 63 kva tf , mounting of 100 kva tf , chopping of tree branches , repairing resagging new guarding ht line, replacement of conductor poles and associated work in daviya aapda edsd jaithra, safe carriage of 8.5 mtr. long pcc pole from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 11/13 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of 9 mtr stp from store center etah/nearest 33/11 kv s/s to direct pit site in distance range 0 to 60 km. including loading & unloading at both ends., safe carriage of line material from store center etah/nearest substation to pit site in distance range 0 to 60 km. including loading & unloading at both ends., opening of binding & removal of dog/ raccoon/ rabbit conductor with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of acsr weasel conductor/ gi wire with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x95+1x35+1x16/3x50mm with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., opening of binding & removal of abc 3x120+1x70+1x16 with 33 kv/ht/lt line from broken pcc poles/rails/ stp and stacking at safer place., erection of 8.5 mtr. long pcc poles as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 9 mtr. stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 11/13 mtr.stp as single support including fixing of all ht/lt accessories etc. complete.pole should be grouted properly as per dvvnl/respo normes, erection of 8.5 mtr. long pcc poles as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., erection of 11mtr. stp as double pole/ section pole including drilling,cutting etc. and fixing of all accessories etc. complete., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with dog/ raccoon/ rabbit conductor including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with acsr weasel conductor/ gi wire including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x95 mm/3x50 mm. including binding & nozzling., laying stringing & sagging of 3 phase 3 wire 33/ht/lt line with abc 3x120+1x70+1x16 including binding & nozzling., straightening of tilted pcc poles/stp/rail single support of ht/lt line after opening of nuzzling, digging of pit applying anti direction force for making of proper alignment of line., straightening of tilted d/p after opening of connection applying anti direction force, digging of dug for proper alignment of line including reconnection etc. complete., opening of ht/lt connections & lowering of 25/63 kva t/f from d/p/plinth and shifting up to in safer place., opening of ht/lt connections & lowering of 100 kva t/f from d/p/plinth and shifting up to in safer place., dismanteling of old/damage stp/rs joist of ht/lt line and carriage to store centre etah, re-sagging of dog/ raccoon/ rabbit conductor loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of acsr weasel conductor/ gi wire loose 33/ht/lt conductor after opening, binding, nozzling etc., re-sagging of abc 3x120+1x70+1x16 loose 33/ht/lt cable after opening, binding, nozzling etc., re-sagging of abc 3x50/3x95 loose 33/ht/lt cable after opening, binding, nozzling etc., replacement of 11 kv cross arms v type broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 11 kv disc insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of cross arms holding clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of f clamps broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of lt shackle insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv cross arm broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin with nut broken/damaged/missing accessories by new accessories including opening of the same and refixing., replacement of 33 kv pin insulator broken/damaged/missing accessories by new accessories including opening of the same and refixing., retightening of stay rod. etc. complete., providing fixing of stay rod with nuzzling etc. complete., earthing of pcc/rs joist/stp as per respo norms., carriage of old material from pit site to je store/store center, etah in distance range 0 to 10 km including loading & unloading and proper stacking., mounting of 25/63 kva t/f on double pole/plinth including making of the connection etc complete., mounting of 100 kva t/f on double pole/plinth including making of the connection etc complete., chopping of tree branches, repairing/ resagging / new guarding of ht lines with gi wire as per respo norms are available inside the detailed notification files. Bidders planning to target this contract in Etah should check the official portal schedule early to complete their online technical and financial submission well before the closing hours.

Tender Inquiry