tender for dome cum reservoir assly.complete (l.h) for fiat bogie with air springs, 1.dome cum reservoir assly.complete (l.h) for fiat bogie with air springs to drg. no. 66 704005, col.i, alt. a = 2 nos. 2.dome cum reservoir assly.complete (r.h) for fiat bogie with air sprin gs to drg no. 66704011, col.i, alt. a = 2 nos. red oxide zinc chromate primer only to be coated to s pecification is:2074 of thickness 15-20 microns. special condition : material specn.no. en10025-5, 2004, s 355j2w+n to be used in lieu of en10025/29, s355j2g3 wherever mentioned in detail drawing. items are to be packed in set. packing instruction. 1. dome shall be supplied in coach sets consisting of lh - 2 nos & rh - 2 nos. proper pairing of lh & rh domes shall be ensured. 2. two coach sets of domes (lh - 4 nos & rh - 4 nos) sh all be packed in wooden or metal pallet to facilitate safe handling and transportation. 3. dome shall be secureley fa stened to the pallets using metal strapping to prevent movement or displacement during transit. 4. each pallet shall be clearly labelled with: item description, manufacturer's name, purchase order(po) number and quantity. 5. the th readed portions shall be adequately protected with suitable protective covers to avoid damage during handling, sto rage and transportation. 6. the 85mm dia spigot hole shall be covered with plastic or rubber caps to prevent dama ge, dust ingress and entry of foreign materials. 7. any water remaining inside the domes after hydro testing shall be completely drained before packing to prevent corrossion and contamination during storage and transit. - warranty period: 72 months after the date of delivery -quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lac s

Latest Tender Detail from integral coach factory ICF for the tender for dome cum reservoir assly.complete (l.h) for fiat bogie with air springs, 1.dome cum reservoir assly.complete (l.h) for fiat bogie with air springs to drg. no. 66 704005, col.i, alt. a = 2 nos. 2.dome cum reservoir assly.complete (r.h) for fiat bogie with air sprin gs to drg no. 66704011, col.i, alt. a = 2 nos. red oxide zinc chromate primer only to be coated to s pecification is:2074 of thickness 15-20 microns. special condition : material specn.no. en10025-5, 2004, s 355j2w+n to be used in lieu of en10025/29, s355j2g3 wherever mentioned in detail drawing. items are to be packed in set. packing instruction. 1. dome shall be supplied in coach sets consisting of lh - 2 nos & rh - 2 nos. proper pairing of lh & rh domes shall be ensured. 2. two coach sets of domes (lh - 4 nos & rh - 4 nos) sh all be packed in wooden or metal pallet to facilitate safe handling and transportation. 3. dome shall be secureley fa stened to the pallets using metal strapping to prevent movement or displacement during transit. 4. each pallet shall be clearly labelled with: item description, manufacturer's name, purchase order(po) number and quantity. 5. the th readed portions shall be adequately protected with suitable protective covers to avoid damage during handling, sto rage and transportation. 6. the 85mm dia spigot hole shall be covered with plastic or rubber caps to prevent dama ge, dust ingress and entry of foreign materials. 7. any water remaining inside the domes after hydro testing shall be completely drained before packing to prevent corrossion and contamination during storage and transit. - warranty period: 72 months after the date of delivery -quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lac s in chennai, tamil nadu,. Reference number 15628827. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!

T18 Ref No:15628827
Tender ID:3261741
Tender Agency:integral coach factory ICF
City:chennai
State:tamil nadu
Tender Related Keywords :transportation, springs, primer
Description :
Tender Value:Refer Document
Tender EMD:Refer Document
Tender Fee:Refer Document
Published Date:Jun 02, 2026
Due Date:Jun 26, 2026
Tender Opening Date:Jun 26, 2026
Tender DocumentsDownload Document
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tender Inquiry

This Government Tender has been Published  by Integral coach factory ICF for work related to transportation,springs,primer in Chennai, Tamil nadu. The Tender work is tender for dome cum reservoir assly.complete (l.h) for fiat bogie with air springs, 1.dome cum reservoir assly.complete (l.h) for fiat bogie with air springs to drg. no. 66 704005, col.i, alt. a = 2 nos. 2.dome cum reservoir assly.complete (r.h) for fiat bogie with air sprin gs to drg no. 66704011, col.i, alt. a = 2 nos. red oxide zinc chromate primer only to be coated to s pecification is:2074 of thickness 15-20 microns. special condition : material specn.no. en10025-5, 2004, s 355j2w+n to be used in lieu of en10025/29, s355j2g3 wherever mentioned in detail drawing. items are to be packed in set. packing instruction. 1. dome shall be supplied in coach sets consisting of lh - 2 nos & rh - 2 nos. proper pairing of lh & rh domes shall be ensured. 2. two coach sets of domes (lh - 4 nos & rh - 4 nos) sh all be packed in wooden or metal pallet to facilitate safe handling and transportation. 3. dome shall be secureley fa stened to the pallets using metal strapping to prevent movement or displacement during transit. 4. each pallet shall be clearly labelled with: item description, manufacturer's name, purchase order(po) number and quantity. 5. the th readed portions shall be adequately protected with suitable protective covers to avoid damage during handling, sto rage and transportation. 6. the 85mm dia spigot hole shall be covered with plastic or rubber caps to prevent dama ge, dust ingress and entry of foreign materials. 7. any water remaining inside the domes after hydro testing shall be completely drained before packing to prevent corrossion and contamination during storage and transit. - warranty period: 72 months after the date of delivery -quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lac s. Tender18 Provide this type Government Tender Information on daily basis.


This tender invites eligible contractors, suppliers, manufacturers, consultants, Startups, Msmes, traders and service providers to submit bids for the specified project, supply, service, or work requirement.


Before applying, interested bidders should review the tender scope, eligibility criteria, estimated contract value, important dates, technical requirements, reqired docuent list for bidder and bid submission instructions as per provided in the official tender documents. 


This Verified Information Provide By Tender18 in this page so Bidder Can Easiy  Understanding tender  requirements and bidders can prepare a compliant and competitive tender proposal.

To participate in the tender for dome cum reservoir assly.complete (l.h) for fiat bogie with air springs, 1.dome cum reservoir assly.complete (l.h) for fiat bogie with air springs to drg. no. 66 704005, col.i, alt. a = 2 nos. 2.dome cum reservoir assly.complete (r.h) for fiat bogie with air sprin gs to drg no. 66704011, col.i, alt. a = 2 nos. red oxide zinc chromate primer only to be coated to s pecification is:2074 of thickness 15-20 microns. special condition : material specn.no. en10025-5, 2004, s 355j2w+n to be used in lieu of en10025/29, s355j2g3 wherever mentioned in detail drawing. items are to be packed in set. packing instruction. 1. dome shall be supplied in coach sets consisting of lh - 2 nos & rh - 2 nos. proper pairing of lh & rh domes shall be ensured. 2. two coach sets of domes (lh - 4 nos & rh - 4 nos) sh all be packed in wooden or metal pallet to facilitate safe handling and transportation. 3. dome shall be secureley fa stened to the pallets using metal strapping to prevent movement or displacement during transit. 4. each pallet shall be clearly labelled with: item description, manufacturer's name, purchase order(po) number and quantity. 5. the th readed portions shall be adequately protected with suitable protective covers to avoid damage during handling, sto rage and transportation. 6. the 85mm dia spigot hole shall be covered with plastic or rubber caps to prevent dama ge, dust ingress and entry of foreign materials. 7. any water remaining inside the domes after hydro testing shall be completely drained before packing to prevent corrossion and contamination during storage and transit. - warranty period: 72 months after the date of delivery -quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lac s, bidders should first download and review all available tender documents. These documents generally include the Notice Inviting Tender (NIT), Bill of Quantities (BOQ), technical specifications, eligibility criteria, scope of work, and bid submission instructions.


Tender Governemnt Authorities like Integral coach factory ICF usually publish these documents on their official eProcurement portals, departmental tender portals, the GeM Tender Portal, or other government procurement platforms or on newspapre. Finding and accessing the correct tender documents across multiple portals can sometimes be time-consuming for bidders. 


To make the process easier, Tender18 provides quick access to the available tender documents related to this Chennai , Tamil nadu tender on a single page. Businesses involved in transportation,springs,primer related products, services, or works can conveniently download the relevant documents and review the tender requirements without spending time searching across different procurement portals.

The tender for dome cum reservoir assly.complete (l.h) for fiat bogie with air springs, 1.dome cum reservoir assly.complete (l.h) for fiat bogie with air springs to drg. no. 66 704005, col.i, alt. a = 2 nos. 2.dome cum reservoir assly.complete (r.h) for fiat bogie with air sprin gs to drg no. 66704011, col.i, alt. a = 2 nos. red oxide zinc chromate primer only to be coated to s pecification is:2074 of thickness 15-20 microns. special condition : material specn.no. en10025-5, 2004, s 355j2w+n to be used in lieu of en10025/29, s355j2g3 wherever mentioned in detail drawing. items are to be packed in set. packing instruction. 1. dome shall be supplied in coach sets consisting of lh - 2 nos & rh - 2 nos. proper pairing of lh & rh domes shall be ensured. 2. two coach sets of domes (lh - 4 nos & rh - 4 nos) sh all be packed in wooden or metal pallet to facilitate safe handling and transportation. 3. dome shall be secureley fa stened to the pallets using metal strapping to prevent movement or displacement during transit. 4. each pallet shall be clearly labelled with: item description, manufacturer's name, purchase order(po) number and quantity. 5. the th readed portions shall be adequately protected with suitable protective covers to avoid damage during handling, sto rage and transportation. 6. the 85mm dia spigot hole shall be covered with plastic or rubber caps to prevent dama ge, dust ingress and entry of foreign materials. 7. any water remaining inside the domes after hydro testing shall be completely drained before packing to prevent corrossion and contamination during storage and transit. - warranty period: 72 months after the date of delivery -quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lac s from Chennai, Tamil nadu may be relevant for contractors, suppliers, vendors, manufacturers, consultants, service providers, startups, MSMEs, and other organizations involved in transportation,springs,primer related products, services, or works. However, eligibility to participate depends on the qualification criteria specified by Integral coach factory ICF in the official tender documents.

Before submitting a bid, interested applicants should carefully review the eligibility conditions, technical requirements, financial criteria, work experience requirements, annual turnover conditions, registrations, certifications, and any other supporting documents required by the tendering authority. The detailed qualification requirements and bidder eligibility criteria are available in the tender notice and related documents provided on this page. 

Ensuring compliance with all eligibility and qualification requirements before bid submission can help bidders avoid disqualification and improve their chances of successful participation in the tender process.

Tende18 provides comprehensive tender bidding services, including a complete tender summary along with a detailed analysis of the Tender Qualification and Eligibility Criteria.

Interested in participating in the tender for dome cum reservoir assly.complete (l.h) for fiat bogie with air springs, 1.dome cum reservoir assly.complete (l.h) for fiat bogie with air springs to drg. no. 66 704005, col.i, alt. a = 2 nos. 2.dome cum reservoir assly.complete (r.h) for fiat bogie with air sprin gs to drg no. 66704011, col.i, alt. a = 2 nos. red oxide zinc chromate primer only to be coated to s pecification is:2074 of thickness 15-20 microns. special condition : material specn.no. en10025-5, 2004, s 355j2w+n to be used in lieu of en10025/29, s355j2g3 wherever mentioned in detail drawing. items are to be packed in set. packing instruction. 1. dome shall be supplied in coach sets consisting of lh - 2 nos & rh - 2 nos. proper pairing of lh & rh domes shall be ensured. 2. two coach sets of domes (lh - 4 nos & rh - 4 nos) sh all be packed in wooden or metal pallet to facilitate safe handling and transportation. 3. dome shall be secureley fa stened to the pallets using metal strapping to prevent movement or displacement during transit. 4. each pallet shall be clearly labelled with: item description, manufacturer's name, purchase order(po) number and quantity. 5. the th readed portions shall be adequately protected with suitable protective covers to avoid damage during handling, sto rage and transportation. 6. the 85mm dia spigot hole shall be covered with plastic or rubber caps to prevent dama ge, dust ingress and entry of foreign materials. 7. any water remaining inside the domes after hydro testing shall be completely drained before packing to prevent corrossion and contamination during storage and transit. - warranty period: 72 months after the date of delivery -quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lac s issued by Integral coach factory ICF for transportation,springs,primer related work in Chennai, Tamil nadu? TENDER18 provides complete assistance to help businesses understand tender requirements, access tender documents, review eligibility criteria, qualification requirements, important dates, and bid submission guidelines associated with this tender.

Our Tender18 Expert Technical team can assist with vendor and GeM registration on the relevant departmental, eProcurement, GeM, or government tender portal, preparation of technical and financial bid documents, compliance with qualification criteria, document verification, and complete online tender submission support. Whether you are a contractor, supplier, manufacturer, consultant, startup, or MSME working in the field of transportation,springs,primer, Tender18 can help simplify the tender participation process and support you throughout every stage of bidding for this tender. so that tender18 is one the top leading tender consultant in Inda.

1.

Whom should I contact if I have further queries about the Tender scope?

You can fill out the integrated inquiry form below on this detail page to share your company profile. Our consultancy desk will review your query regarding transportation,springs,primer parameters and guide you on how to coordinate efficiently with the procurement team of Integral coach factory ICF

2.

How can Tender18 assist my business in winning this government contract?

Tender18 provides end-to-end professional bidding support and documentation advisory for tender for dome cum reservoir assly.complete (l.h) for fiat bogie with air springs, 1.dome cum reservoir assly.complete (l.h) for fiat bogie with air springs to drg. no. 66 704005, col.i, alt. a = 2 nos. 2.dome cum reservoir assly.complete (r.h) for fiat bogie with air sprin gs to drg no. 66704011, col.i, alt. a = 2 nos. red oxide zinc chromate primer only to be coated to s pecification is:2074 of thickness 15-20 microns. special condition : material specn.no. en10025-5, 2004, s 355j2w+n to be used in lieu of en10025/29, s355j2g3 wherever mentioned in detail drawing. items are to be packed in set. packing instruction. 1. dome shall be supplied in coach sets consisting of lh - 2 nos & rh - 2 nos. proper pairing of lh & rh domes shall be ensured. 2. two coach sets of domes (lh - 4 nos & rh - 4 nos) sh all be packed in wooden or metal pallet to facilitate safe handling and transportation. 3. dome shall be secureley fa stened to the pallets using metal strapping to prevent movement or displacement during transit. 4. each pallet shall be clearly labelled with: item description, manufacturer's name, purchase order(po) number and quantity. 5. the th readed portions shall be adequately protected with suitable protective covers to avoid damage during handling, sto rage and transportation. 6. the 85mm dia spigot hole shall be covered with plastic or rubber caps to prevent dama ge, dust ingress and entry of foreign materials. 7. any water remaining inside the domes after hydro testing shall be completely drained before packing to prevent corrossion and contamination during storage and transit. - warranty period: 72 months after the date of delivery -quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lac s . Our senior analysts help you decode the complete project guidelines, manage accurate costing sheets, and complete error-free submissions on the official platform used by Integral coach factory ICF.

3.

What are the main reasons for a technical tender rejection?

Most online bids face rejection during the initial evaluation round due to avoidable errors like uploading blurred document scans, submitting expired DSCs, or missing critical experience papers required for tender for dome cum reservoir assly.complete (l.h) for fiat bogie with air springs, 1.dome cum reservoir assly.complete (l.h) for fiat bogie with air springs to drg. no. 66 704005, col.i, alt. a = 2 nos. 2.dome cum reservoir assly.complete (r.h) for fiat bogie with air sprin gs to drg no. 66704011, col.i, alt. a = 2 nos. red oxide zinc chromate primer only to be coated to s pecification is:2074 of thickness 15-20 microns. special condition : material specn.no. en10025-5, 2004, s 355j2w+n to be used in lieu of en10025/29, s355j2g3 wherever mentioned in detail drawing. items are to be packed in set. packing instruction. 1. dome shall be supplied in coach sets consisting of lh - 2 nos & rh - 2 nos. proper pairing of lh & rh domes shall be ensured. 2. two coach sets of domes (lh - 4 nos & rh - 4 nos) sh all be packed in wooden or metal pallet to facilitate safe handling and transportation. 3. dome shall be secureley fa stened to the pallets using metal strapping to prevent movement or displacement during transit. 4. each pallet shall be clearly labelled with: item description, manufacturer's name, purchase order(po) number and quantity. 5. the th readed portions shall be adequately protected with suitable protective covers to avoid damage during handling, sto rage and transportation. 6. the 85mm dia spigot hole shall be covered with plastic or rubber caps to prevent dama ge, dust ingress and entry of foreign materials. 7. any water remaining inside the domes after hydro testing shall be completely drained before packing to prevent corrossion and contamination during storage and transit. - warranty period: 72 months after the date of delivery -quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lac s in Tamil nadu.

4.

Can contractors located outside the local region participate in this bid?

Eligibility for outstation bidders depends entirely on the terms set inside the document for tender for dome cum reservoir assly.complete (l.h) for fiat bogie with air springs, 1.dome cum reservoir assly.complete (l.h) for fiat bogie with air springs to drg. no. 66 704005, col.i, alt. a = 2 nos. 2.dome cum reservoir assly.complete (r.h) for fiat bogie with air sprin gs to drg no. 66704011, col.i, alt. a = 2 nos. red oxide zinc chromate primer only to be coated to s pecification is:2074 of thickness 15-20 microns. special condition : material specn.no. en10025-5, 2004, s 355j2w+n to be used in lieu of en10025/29, s355j2g3 wherever mentioned in detail drawing. items are to be packed in set. packing instruction. 1. dome shall be supplied in coach sets consisting of lh - 2 nos & rh - 2 nos. proper pairing of lh & rh domes shall be ensured. 2. two coach sets of domes (lh - 4 nos & rh - 4 nos) sh all be packed in wooden or metal pallet to facilitate safe handling and transportation. 3. dome shall be secureley fa stened to the pallets using metal strapping to prevent movement or displacement during transit. 4. each pallet shall be clearly labelled with: item description, manufacturer's name, purchase order(po) number and quantity. 5. the th readed portions shall be adequately protected with suitable protective covers to avoid damage during handling, sto rage and transportation. 6. the 85mm dia spigot hole shall be covered with plastic or rubber caps to prevent dama ge, dust ingress and entry of foreign materials. 7. any water remaining inside the domes after hydro testing shall be completely drained before packing to prevent corrossion and contamination during storage and transit. - warranty period: 72 months after the date of delivery -quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lac s. While many public sector projects allow national competitive bidding, certain localized works require local offices or specific registration metrics in Chennai.

5.

Do I need an active GeM Portal registration to apply for this work?

If this procurement is routed through the central marketplace, an active GeM Seller ID is mandatory to supply transportation,springs,primer items. Tender18 offers complete assistance for brand cataloging, profile creation, and vendor assessment required officially by Integral coach factory ICF

6.

What are the primary legal documents required to submit a valid bid?

To register an eligible bid for these transportation,springs,primer contracts, companies must prepare their core compliance documents. Vendors operating across Tamil nadu must ensure they possess a valid GST registration, permanent account number (PAN), and active Class-3 Digital Signature Certificates.

7.

What products or services are required for this active work?

This public procurement cycle is specifically looking for qualified vendors and suppliers who can provide high-quality transportation,springs,primer solutions. The operational execution, delivery, and deployment of these materials must be managed locally within the Chennai region.

8.

Where can I review the estimated cost or budget details for this Tender?

The estimated project cost and budget thresholds can be reviewed directly inside the tender document. Bidders can analyze these qualification files to check if their firm meets the financial capability criteria specified for tender for dome cum reservoir assly.complete (l.h) for fiat bogie with air springs, 1.dome cum reservoir assly.complete (l.h) for fiat bogie with air springs to drg. no. 66 704005, col.i, alt. a = 2 nos. 2.dome cum reservoir assly.complete (r.h) for fiat bogie with air sprin gs to drg no. 66704011, col.i, alt. a = 2 nos. red oxide zinc chromate primer only to be coated to s pecification is:2074 of thickness 15-20 microns. special condition : material specn.no. en10025-5, 2004, s 355j2w+n to be used in lieu of en10025/29, s355j2g3 wherever mentioned in detail drawing. items are to be packed in set. packing instruction. 1. dome shall be supplied in coach sets consisting of lh - 2 nos & rh - 2 nos. proper pairing of lh & rh domes shall be ensured. 2. two coach sets of domes (lh - 4 nos & rh - 4 nos) sh all be packed in wooden or metal pallet to facilitate safe handling and transportation. 3. dome shall be secureley fa stened to the pallets using metal strapping to prevent movement or displacement during transit. 4. each pallet shall be clearly labelled with: item description, manufacturer's name, purchase order(po) number and quantity. 5. the th readed portions shall be adequately protected with suitable protective covers to avoid damage during handling, sto rage and transportation. 6. the 85mm dia spigot hole shall be covered with plastic or rubber caps to prevent dama ge, dust ingress and entry of foreign materials. 7. any water remaining inside the domes after hydro testing shall be completely drained before packing to prevent corrossion and contamination during storage and transit. - warranty period: 72 months after the date of delivery -quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lac s by Integral coach factory ICF

9.

How can I download the official BOQ file for this opportunity?

You can download the commercial Bill of Quantities (BOQ) spreadsheet directly using the secure link provided on this page. The BOQ file contains the item descriptions and rate filling forms officially validated for tender for dome cum reservoir assly.complete (l.h) for fiat bogie with air springs, 1.dome cum reservoir assly.complete (l.h) for fiat bogie with air springs to drg. no. 66 704005, col.i, alt. a = 2 nos. 2.dome cum reservoir assly.complete (r.h) for fiat bogie with air sprin gs to drg no. 66704011, col.i, alt. a = 2 nos. red oxide zinc chromate primer only to be coated to s pecification is:2074 of thickness 15-20 microns. special condition : material specn.no. en10025-5, 2004, s 355j2w+n to be used in lieu of en10025/29, s355j2g3 wherever mentioned in detail drawing. items are to be packed in set. packing instruction. 1. dome shall be supplied in coach sets consisting of lh - 2 nos & rh - 2 nos. proper pairing of lh & rh domes shall be ensured. 2. two coach sets of domes (lh - 4 nos & rh - 4 nos) sh all be packed in wooden or metal pallet to facilitate safe handling and transportation. 3. dome shall be secureley fa stened to the pallets using metal strapping to prevent movement or displacement during transit. 4. each pallet shall be clearly labelled with: item description, manufacturer's name, purchase order(po) number and quantity. 5. the th readed portions shall be adequately protected with suitable protective covers to avoid damage during handling, sto rage and transportation. 6. the 85mm dia spigot hole shall be covered with plastic or rubber caps to prevent dama ge, dust ingress and entry of foreign materials. 7. any water remaining inside the domes after hydro testing shall be completely drained before packing to prevent corrossion and contamination during storage and transit. - warranty period: 72 months after the date of delivery -quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lac s within the Tamil nadu jurisdiction

10.

How can I find the submission closing date for this contract?

The official timeline and deadline details for tender for dome cum reservoir assly.complete (l.h) for fiat bogie with air springs, 1.dome cum reservoir assly.complete (l.h) for fiat bogie with air springs to drg. no. 66 704005, col.i, alt. a = 2 nos. 2.dome cum reservoir assly.complete (r.h) for fiat bogie with air sprin gs to drg no. 66704011, col.i, alt. a = 2 nos. red oxide zinc chromate primer only to be coated to s pecification is:2074 of thickness 15-20 microns. special condition : material specn.no. en10025-5, 2004, s 355j2w+n to be used in lieu of en10025/29, s355j2g3 wherever mentioned in detail drawing. items are to be packed in set. packing instruction. 1. dome shall be supplied in coach sets consisting of lh - 2 nos & rh - 2 nos. proper pairing of lh & rh domes shall be ensured. 2. two coach sets of domes (lh - 4 nos & rh - 4 nos) sh all be packed in wooden or metal pallet to facilitate safe handling and transportation. 3. dome shall be secureley fa stened to the pallets using metal strapping to prevent movement or displacement during transit. 4. each pallet shall be clearly labelled with: item description, manufacturer's name, purchase order(po) number and quantity. 5. the th readed portions shall be adequately protected with suitable protective covers to avoid damage during handling, sto rage and transportation. 6. the 85mm dia spigot hole shall be covered with plastic or rubber caps to prevent dama ge, dust ingress and entry of foreign materials. 7. any water remaining inside the domes after hydro testing shall be completely drained before packing to prevent corrossion and contamination during storage and transit. - warranty period: 72 months after the date of delivery -quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lac s are available inside the detailed notification files. Bidders planning to target this contract in Chennai should check the official portal schedule early to complete their online technical and financial submission well before the closing hours.