tender for transformer 60 kva 750/415v, 3p, 60 kva transformer 750/415v, 3 phase, to rdso spec.no. roso / pe /spec /ac/00 80-2007.(rev.2) with rdso letter no.el/7.1.108/trans dt.17/02/2020. note: - i. rcf drawings cc7 1216 & cc71217 attached. 2. packing instruction: pi 146 ver 2.0. - warranty period: 30 months after the date of delivery
Latest Tender Detail from integral coach factory ICF for the tender for transformer 60 kva 750/415v, 3p, 60 kva transformer 750/415v, 3 phase, to rdso spec.no. roso / pe /spec /ac/00 80-2007.(rev.2) with rdso letter no.el/7.1.108/trans dt.17/02/2020. note: - i. rcf drawings cc7 1216 & cc71217 attached. 2. packing instruction: pi 146 ver 2.0. - warranty period: 30 months after the date of delivery in chennai, tamil nadu,. Reference number 15628810. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!