tender for title1 , title2 , title3 , title4 , title5 , title6 , title7 , title8 , title9 , title10, repair of transformer, disconnecting ht and lt supply taking down the defective transformer indoor outdoor type from four pole two pole structure or lifting from the outdoor type foundation or taking out from sub station bldg using a crane of suitable capacity and slings ropes etc as required and shifting the same to civil workshop for repairs complete all as directed for transformer capacity 400 kva, shifting back the repaired transformer indoor outdoor type from civil workshop to site reinstalling at original position and fixing properly on four pole two pole structure or outdoor type foundation or inside a sub station bldg using a crane of suitable capacity and slings ropes etc as required making ht lt side connections and testing for satisfactorily working complete all as directed for transformer of capacity 400 kva, draining out transformer oil from the transformer and storing the same in suitable containers to be arranged by contractor without any extra cost opening the top cover and lifting up the core assembly carefully to check the condition of transformer windings and core retanking the same after repairing checking of leakage from transformer body and repairing welding works required for making transformer body leak proof refilling the transformer oil dully dehydrated and filtered dehydration and filteration to be paid separately and making all connections with ht lt side bushings refixing the top cover and testing the transformer with a suitable capacity insulation tester complete all as directed for transformer of cap 400 kva, m and l for rewinding of burnt out defective ht copper coils with new super enamelled heavy duty copper winding wires of size matching to the existing one including varnishing drying in a suitable oven and all insulating material such as cotton sleeves tapes etc and connections with bushing terminals complete all as specified and directed, all as per item no 4 above but lt copper coils complete all as specified and directed, m and l for painting the transformer tank from inside with two coats of zinc chromite after preparing the tank walls bottom top cover inner side by properly cleaning the surfaces oil free complete all as directed for transformer capacity 400 kva, m and l for replacement of defective ht porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, m and l for replacement of defective lt porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, dehydration and filteration of transformer oil for indoor outdoor type transformers of any capacity at site using transformer oil filteration plant to improve di electric strength not less than 45 kv at 2 point 5 mm electrode gap complete all as directed note unit rate quoted shall be deemed to include the charges for hiring of oil filteration plant shifting to different locations at cantt area testing of samples of oil as per requirement and nothing extra will be paid on this account, s and f new transformer oil for replacement or topping up the level of oil having dielectric strength not less than 45 complete all as specified and directed

Latest Tender Detail from indian army for the tender for title1 , title2 , title3 , title4 , title5 , title6 , title7 , title8 , title9 , title10, repair of transformer, disconnecting ht and lt supply taking down the defective transformer indoor outdoor type from four pole two pole structure or lifting from the outdoor type foundation or taking out from sub station bldg using a crane of suitable capacity and slings ropes etc as required and shifting the same to civil workshop for repairs complete all as directed for transformer capacity 400 kva, shifting back the repaired transformer indoor outdoor type from civil workshop to site reinstalling at original position and fixing properly on four pole two pole structure or outdoor type foundation or inside a sub station bldg using a crane of suitable capacity and slings ropes etc as required making ht lt side connections and testing for satisfactorily working complete all as directed for transformer of capacity 400 kva, draining out transformer oil from the transformer and storing the same in suitable containers to be arranged by contractor without any extra cost opening the top cover and lifting up the core assembly carefully to check the condition of transformer windings and core retanking the same after repairing checking of leakage from transformer body and repairing welding works required for making transformer body leak proof refilling the transformer oil dully dehydrated and filtered dehydration and filteration to be paid separately and making all connections with ht lt side bushings refixing the top cover and testing the transformer with a suitable capacity insulation tester complete all as directed for transformer of cap 400 kva, m and l for rewinding of burnt out defective ht copper coils with new super enamelled heavy duty copper winding wires of size matching to the existing one including varnishing drying in a suitable oven and all insulating material such as cotton sleeves tapes etc and connections with bushing terminals complete all as specified and directed, all as per item no 4 above but lt copper coils complete all as specified and directed, m and l for painting the transformer tank from inside with two coats of zinc chromite after preparing the tank walls bottom top cover inner side by properly cleaning the surfaces oil free complete all as directed for transformer capacity 400 kva, m and l for replacement of defective ht porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, m and l for replacement of defective lt porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, dehydration and filteration of transformer oil for indoor outdoor type transformers of any capacity at site using transformer oil filteration plant to improve di electric strength not less than 45 kv at 2 point 5 mm electrode gap complete all as directed note unit rate quoted shall be deemed to include the charges for hiring of oil filteration plant shifting to different locations at cantt area testing of samples of oil as per requirement and nothing extra will be paid on this account, s and f new transformer oil for replacement or topping up the level of oil having dielectric strength not less than 45 complete all as specified and directed in shimla, himachal pradesh,. Reference number 15264089. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!

T18 Ref No:15264089
Tender ID:GEM/2026/B/7357292
Tender Agency:indian army
City:shimla
State:himachal pradesh
Description :total quantity = 858 ----- document required from seller = experience criteria,past performance,bidder turnover,oem authorization certificate,oem annual turnover ----- evaluation method = total value wise evaluation
Tender Value:Refer Document
Tender EMD:Refer Document
Tender Fee:Refer Document
Published Date:May 07, 2026
Due Date:May 18, 2026
Tender Opening Date:May 18, 2026
T18 Ref No:15264089Tender Value:Refer Document
Tender ID:GEM/2026/B/7357292Tender EMD:Refer Document
Tender Agency:indian armyTender Fee:Refer Document
City:shimlaPublished Date:May 07, 2026
State:himachal pradeshDue Date:May 18, 2026
Tender Related Keywords :-Tender Opening Date:May 18, 2026
Description :total quantity = 858 ----- document required from seller = experience criteria,past performance,bidder turnover,oem authorization certificate,oem annual turnover ----- evaluation method = total value wise evaluation
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

This Government Tender has been Published  by Indian army for work related to in Shimla, Himachal pradesh. The Tender work is tender for title1 , title2 , title3 , title4 , title5 , title6 , title7 , title8 , title9 , title10, repair of transformer, disconnecting ht and lt supply taking down the defective transformer indoor outdoor type from four pole two pole structure or lifting from the outdoor type foundation or taking out from sub station bldg using a crane of suitable capacity and slings ropes etc as required and shifting the same to civil workshop for repairs complete all as directed for transformer capacity 400 kva, shifting back the repaired transformer indoor outdoor type from civil workshop to site reinstalling at original position and fixing properly on four pole two pole structure or outdoor type foundation or inside a sub station bldg using a crane of suitable capacity and slings ropes etc as required making ht lt side connections and testing for satisfactorily working complete all as directed for transformer of capacity 400 kva, draining out transformer oil from the transformer and storing the same in suitable containers to be arranged by contractor without any extra cost opening the top cover and lifting up the core assembly carefully to check the condition of transformer windings and core retanking the same after repairing checking of leakage from transformer body and repairing welding works required for making transformer body leak proof refilling the transformer oil dully dehydrated and filtered dehydration and filteration to be paid separately and making all connections with ht lt side bushings refixing the top cover and testing the transformer with a suitable capacity insulation tester complete all as directed for transformer of cap 400 kva, m and l for rewinding of burnt out defective ht copper coils with new super enamelled heavy duty copper winding wires of size matching to the existing one including varnishing drying in a suitable oven and all insulating material such as cotton sleeves tapes etc and connections with bushing terminals complete all as specified and directed, all as per item no 4 above but lt copper coils complete all as specified and directed, m and l for painting the transformer tank from inside with two coats of zinc chromite after preparing the tank walls bottom top cover inner side by properly cleaning the surfaces oil free complete all as directed for transformer capacity 400 kva, m and l for replacement of defective ht porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, m and l for replacement of defective lt porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, dehydration and filteration of transformer oil for indoor outdoor type transformers of any capacity at site using transformer oil filteration plant to improve di electric strength not less than 45 kv at 2 point 5 mm electrode gap complete all as directed note unit rate quoted shall be deemed to include the charges for hiring of oil filteration plant shifting to different locations at cantt area testing of samples of oil as per requirement and nothing extra will be paid on this account, s and f new transformer oil for replacement or topping up the level of oil having dielectric strength not less than 45 complete all as specified and directed. Tender18 Provide this type Government Tender Information on daily basis.


This tender invites eligible contractors, suppliers, manufacturers, consultants, Startups, Msmes, traders and service providers to submit bids for the specified project, supply, service, or work requirement.


Before applying, interested bidders should review the tender scope, eligibility criteria, estimated contract value, important dates, technical requirements, reqired docuent list for bidder and bid submission instructions as per provided in the official tender documents. 


This Verified Information Provide By Tender18 in this page so Bidder Can Easiy  Understanding tender  requirements and bidders can prepare a compliant and competitive tender proposal.

To participate in the tender for title1 , title2 , title3 , title4 , title5 , title6 , title7 , title8 , title9 , title10, repair of transformer, disconnecting ht and lt supply taking down the defective transformer indoor outdoor type from four pole two pole structure or lifting from the outdoor type foundation or taking out from sub station bldg using a crane of suitable capacity and slings ropes etc as required and shifting the same to civil workshop for repairs complete all as directed for transformer capacity 400 kva, shifting back the repaired transformer indoor outdoor type from civil workshop to site reinstalling at original position and fixing properly on four pole two pole structure or outdoor type foundation or inside a sub station bldg using a crane of suitable capacity and slings ropes etc as required making ht lt side connections and testing for satisfactorily working complete all as directed for transformer of capacity 400 kva, draining out transformer oil from the transformer and storing the same in suitable containers to be arranged by contractor without any extra cost opening the top cover and lifting up the core assembly carefully to check the condition of transformer windings and core retanking the same after repairing checking of leakage from transformer body and repairing welding works required for making transformer body leak proof refilling the transformer oil dully dehydrated and filtered dehydration and filteration to be paid separately and making all connections with ht lt side bushings refixing the top cover and testing the transformer with a suitable capacity insulation tester complete all as directed for transformer of cap 400 kva, m and l for rewinding of burnt out defective ht copper coils with new super enamelled heavy duty copper winding wires of size matching to the existing one including varnishing drying in a suitable oven and all insulating material such as cotton sleeves tapes etc and connections with bushing terminals complete all as specified and directed, all as per item no 4 above but lt copper coils complete all as specified and directed, m and l for painting the transformer tank from inside with two coats of zinc chromite after preparing the tank walls bottom top cover inner side by properly cleaning the surfaces oil free complete all as directed for transformer capacity 400 kva, m and l for replacement of defective ht porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, m and l for replacement of defective lt porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, dehydration and filteration of transformer oil for indoor outdoor type transformers of any capacity at site using transformer oil filteration plant to improve di electric strength not less than 45 kv at 2 point 5 mm electrode gap complete all as directed note unit rate quoted shall be deemed to include the charges for hiring of oil filteration plant shifting to different locations at cantt area testing of samples of oil as per requirement and nothing extra will be paid on this account, s and f new transformer oil for replacement or topping up the level of oil having dielectric strength not less than 45 complete all as specified and directed, bidders should first download and review all available tender documents. These documents generally include the Notice Inviting Tender (NIT), Bill of Quantities (BOQ), technical specifications, eligibility criteria, scope of work, and bid submission instructions.


Tender Governemnt Authorities like Indian army usually publish these documents on their official eProcurement portals, departmental tender portals, the GeM Tender Portal, or other government procurement platforms or on newspapre. Finding and accessing the correct tender documents across multiple portals can sometimes be time-consuming for bidders. 


To make the process easier, Tender18 provides quick access to the available tender documents related to this Shimla , Himachal pradesh tender on a single page. Businesses involved in related products, services, or works can conveniently download the relevant documents and review the tender requirements without spending time searching across different procurement portals.

The tender for title1 , title2 , title3 , title4 , title5 , title6 , title7 , title8 , title9 , title10, repair of transformer, disconnecting ht and lt supply taking down the defective transformer indoor outdoor type from four pole two pole structure or lifting from the outdoor type foundation or taking out from sub station bldg using a crane of suitable capacity and slings ropes etc as required and shifting the same to civil workshop for repairs complete all as directed for transformer capacity 400 kva, shifting back the repaired transformer indoor outdoor type from civil workshop to site reinstalling at original position and fixing properly on four pole two pole structure or outdoor type foundation or inside a sub station bldg using a crane of suitable capacity and slings ropes etc as required making ht lt side connections and testing for satisfactorily working complete all as directed for transformer of capacity 400 kva, draining out transformer oil from the transformer and storing the same in suitable containers to be arranged by contractor without any extra cost opening the top cover and lifting up the core assembly carefully to check the condition of transformer windings and core retanking the same after repairing checking of leakage from transformer body and repairing welding works required for making transformer body leak proof refilling the transformer oil dully dehydrated and filtered dehydration and filteration to be paid separately and making all connections with ht lt side bushings refixing the top cover and testing the transformer with a suitable capacity insulation tester complete all as directed for transformer of cap 400 kva, m and l for rewinding of burnt out defective ht copper coils with new super enamelled heavy duty copper winding wires of size matching to the existing one including varnishing drying in a suitable oven and all insulating material such as cotton sleeves tapes etc and connections with bushing terminals complete all as specified and directed, all as per item no 4 above but lt copper coils complete all as specified and directed, m and l for painting the transformer tank from inside with two coats of zinc chromite after preparing the tank walls bottom top cover inner side by properly cleaning the surfaces oil free complete all as directed for transformer capacity 400 kva, m and l for replacement of defective ht porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, m and l for replacement of defective lt porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, dehydration and filteration of transformer oil for indoor outdoor type transformers of any capacity at site using transformer oil filteration plant to improve di electric strength not less than 45 kv at 2 point 5 mm electrode gap complete all as directed note unit rate quoted shall be deemed to include the charges for hiring of oil filteration plant shifting to different locations at cantt area testing of samples of oil as per requirement and nothing extra will be paid on this account, s and f new transformer oil for replacement or topping up the level of oil having dielectric strength not less than 45 complete all as specified and directed from Shimla, Himachal pradesh may be relevant for contractors, suppliers, vendors, manufacturers, consultants, service providers, startups, MSMEs, and other organizations involved in related products, services, or works. However, eligibility to participate depends on the qualification criteria specified by Indian army in the official tender documents.

Before submitting a bid, interested applicants should carefully review the eligibility conditions, technical requirements, financial criteria, work experience requirements, annual turnover conditions, registrations, certifications, and any other supporting documents required by the tendering authority. The detailed qualification requirements and bidder eligibility criteria are available in the tender notice and related documents provided on this page. 

Ensuring compliance with all eligibility and qualification requirements before bid submission can help bidders avoid disqualification and improve their chances of successful participation in the tender process.

Tende18 provides comprehensive tender bidding services, including a complete tender summary along with a detailed analysis of the Tender Qualification and Eligibility Criteria.

Interested in participating in the tender for title1 , title2 , title3 , title4 , title5 , title6 , title7 , title8 , title9 , title10, repair of transformer, disconnecting ht and lt supply taking down the defective transformer indoor outdoor type from four pole two pole structure or lifting from the outdoor type foundation or taking out from sub station bldg using a crane of suitable capacity and slings ropes etc as required and shifting the same to civil workshop for repairs complete all as directed for transformer capacity 400 kva, shifting back the repaired transformer indoor outdoor type from civil workshop to site reinstalling at original position and fixing properly on four pole two pole structure or outdoor type foundation or inside a sub station bldg using a crane of suitable capacity and slings ropes etc as required making ht lt side connections and testing for satisfactorily working complete all as directed for transformer of capacity 400 kva, draining out transformer oil from the transformer and storing the same in suitable containers to be arranged by contractor without any extra cost opening the top cover and lifting up the core assembly carefully to check the condition of transformer windings and core retanking the same after repairing checking of leakage from transformer body and repairing welding works required for making transformer body leak proof refilling the transformer oil dully dehydrated and filtered dehydration and filteration to be paid separately and making all connections with ht lt side bushings refixing the top cover and testing the transformer with a suitable capacity insulation tester complete all as directed for transformer of cap 400 kva, m and l for rewinding of burnt out defective ht copper coils with new super enamelled heavy duty copper winding wires of size matching to the existing one including varnishing drying in a suitable oven and all insulating material such as cotton sleeves tapes etc and connections with bushing terminals complete all as specified and directed, all as per item no 4 above but lt copper coils complete all as specified and directed, m and l for painting the transformer tank from inside with two coats of zinc chromite after preparing the tank walls bottom top cover inner side by properly cleaning the surfaces oil free complete all as directed for transformer capacity 400 kva, m and l for replacement of defective ht porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, m and l for replacement of defective lt porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, dehydration and filteration of transformer oil for indoor outdoor type transformers of any capacity at site using transformer oil filteration plant to improve di electric strength not less than 45 kv at 2 point 5 mm electrode gap complete all as directed note unit rate quoted shall be deemed to include the charges for hiring of oil filteration plant shifting to different locations at cantt area testing of samples of oil as per requirement and nothing extra will be paid on this account, s and f new transformer oil for replacement or topping up the level of oil having dielectric strength not less than 45 complete all as specified and directed issued by Indian army for related work in Shimla, Himachal pradesh? TENDER18 provides complete assistance to help businesses understand tender requirements, access tender documents, review eligibility criteria, qualification requirements, important dates, and bid submission guidelines associated with this tender.

Our Tender18 Expert Technical team can assist with vendor and GeM registration on the relevant departmental, eProcurement, GeM, or government tender portal, preparation of technical and financial bid documents, compliance with qualification criteria, document verification, and complete online tender submission support. Whether you are a contractor, supplier, manufacturer, consultant, startup, or MSME working in the field of , Tender18 can help simplify the tender participation process and support you throughout every stage of bidding for this tender. so that tender18 is one the top leading tender consultant in Inda.

1.

Whom should I contact if I have further queries about the Tender scope?

You can fill out the integrated inquiry form below on this detail page to share your company profile. Our consultancy desk will review your query regarding parameters and guide you on how to coordinate efficiently with the procurement team of Indian army

2.

How can Tender18 assist my business in winning this government contract?

Tender18 provides end-to-end professional bidding support and documentation advisory for tender for title1 , title2 , title3 , title4 , title5 , title6 , title7 , title8 , title9 , title10, repair of transformer, disconnecting ht and lt supply taking down the defective transformer indoor outdoor type from four pole two pole structure or lifting from the outdoor type foundation or taking out from sub station bldg using a crane of suitable capacity and slings ropes etc as required and shifting the same to civil workshop for repairs complete all as directed for transformer capacity 400 kva, shifting back the repaired transformer indoor outdoor type from civil workshop to site reinstalling at original position and fixing properly on four pole two pole structure or outdoor type foundation or inside a sub station bldg using a crane of suitable capacity and slings ropes etc as required making ht lt side connections and testing for satisfactorily working complete all as directed for transformer of capacity 400 kva, draining out transformer oil from the transformer and storing the same in suitable containers to be arranged by contractor without any extra cost opening the top cover and lifting up the core assembly carefully to check the condition of transformer windings and core retanking the same after repairing checking of leakage from transformer body and repairing welding works required for making transformer body leak proof refilling the transformer oil dully dehydrated and filtered dehydration and filteration to be paid separately and making all connections with ht lt side bushings refixing the top cover and testing the transformer with a suitable capacity insulation tester complete all as directed for transformer of cap 400 kva, m and l for rewinding of burnt out defective ht copper coils with new super enamelled heavy duty copper winding wires of size matching to the existing one including varnishing drying in a suitable oven and all insulating material such as cotton sleeves tapes etc and connections with bushing terminals complete all as specified and directed, all as per item no 4 above but lt copper coils complete all as specified and directed, m and l for painting the transformer tank from inside with two coats of zinc chromite after preparing the tank walls bottom top cover inner side by properly cleaning the surfaces oil free complete all as directed for transformer capacity 400 kva, m and l for replacement of defective ht porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, m and l for replacement of defective lt porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, dehydration and filteration of transformer oil for indoor outdoor type transformers of any capacity at site using transformer oil filteration plant to improve di electric strength not less than 45 kv at 2 point 5 mm electrode gap complete all as directed note unit rate quoted shall be deemed to include the charges for hiring of oil filteration plant shifting to different locations at cantt area testing of samples of oil as per requirement and nothing extra will be paid on this account, s and f new transformer oil for replacement or topping up the level of oil having dielectric strength not less than 45 complete all as specified and directed . Our senior analysts help you decode the complete project guidelines, manage accurate costing sheets, and complete error-free submissions on the official platform used by Indian army.

3.

What are the main reasons for a technical tender rejection?

Most online bids face rejection during the initial evaluation round due to avoidable errors like uploading blurred document scans, submitting expired DSCs, or missing critical experience papers required for tender for title1 , title2 , title3 , title4 , title5 , title6 , title7 , title8 , title9 , title10, repair of transformer, disconnecting ht and lt supply taking down the defective transformer indoor outdoor type from four pole two pole structure or lifting from the outdoor type foundation or taking out from sub station bldg using a crane of suitable capacity and slings ropes etc as required and shifting the same to civil workshop for repairs complete all as directed for transformer capacity 400 kva, shifting back the repaired transformer indoor outdoor type from civil workshop to site reinstalling at original position and fixing properly on four pole two pole structure or outdoor type foundation or inside a sub station bldg using a crane of suitable capacity and slings ropes etc as required making ht lt side connections and testing for satisfactorily working complete all as directed for transformer of capacity 400 kva, draining out transformer oil from the transformer and storing the same in suitable containers to be arranged by contractor without any extra cost opening the top cover and lifting up the core assembly carefully to check the condition of transformer windings and core retanking the same after repairing checking of leakage from transformer body and repairing welding works required for making transformer body leak proof refilling the transformer oil dully dehydrated and filtered dehydration and filteration to be paid separately and making all connections with ht lt side bushings refixing the top cover and testing the transformer with a suitable capacity insulation tester complete all as directed for transformer of cap 400 kva, m and l for rewinding of burnt out defective ht copper coils with new super enamelled heavy duty copper winding wires of size matching to the existing one including varnishing drying in a suitable oven and all insulating material such as cotton sleeves tapes etc and connections with bushing terminals complete all as specified and directed, all as per item no 4 above but lt copper coils complete all as specified and directed, m and l for painting the transformer tank from inside with two coats of zinc chromite after preparing the tank walls bottom top cover inner side by properly cleaning the surfaces oil free complete all as directed for transformer capacity 400 kva, m and l for replacement of defective ht porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, m and l for replacement of defective lt porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, dehydration and filteration of transformer oil for indoor outdoor type transformers of any capacity at site using transformer oil filteration plant to improve di electric strength not less than 45 kv at 2 point 5 mm electrode gap complete all as directed note unit rate quoted shall be deemed to include the charges for hiring of oil filteration plant shifting to different locations at cantt area testing of samples of oil as per requirement and nothing extra will be paid on this account, s and f new transformer oil for replacement or topping up the level of oil having dielectric strength not less than 45 complete all as specified and directed in Himachal pradesh.

4.

Can contractors located outside the local region participate in this bid?

Eligibility for outstation bidders depends entirely on the terms set inside the document for tender for title1 , title2 , title3 , title4 , title5 , title6 , title7 , title8 , title9 , title10, repair of transformer, disconnecting ht and lt supply taking down the defective transformer indoor outdoor type from four pole two pole structure or lifting from the outdoor type foundation or taking out from sub station bldg using a crane of suitable capacity and slings ropes etc as required and shifting the same to civil workshop for repairs complete all as directed for transformer capacity 400 kva, shifting back the repaired transformer indoor outdoor type from civil workshop to site reinstalling at original position and fixing properly on four pole two pole structure or outdoor type foundation or inside a sub station bldg using a crane of suitable capacity and slings ropes etc as required making ht lt side connections and testing for satisfactorily working complete all as directed for transformer of capacity 400 kva, draining out transformer oil from the transformer and storing the same in suitable containers to be arranged by contractor without any extra cost opening the top cover and lifting up the core assembly carefully to check the condition of transformer windings and core retanking the same after repairing checking of leakage from transformer body and repairing welding works required for making transformer body leak proof refilling the transformer oil dully dehydrated and filtered dehydration and filteration to be paid separately and making all connections with ht lt side bushings refixing the top cover and testing the transformer with a suitable capacity insulation tester complete all as directed for transformer of cap 400 kva, m and l for rewinding of burnt out defective ht copper coils with new super enamelled heavy duty copper winding wires of size matching to the existing one including varnishing drying in a suitable oven and all insulating material such as cotton sleeves tapes etc and connections with bushing terminals complete all as specified and directed, all as per item no 4 above but lt copper coils complete all as specified and directed, m and l for painting the transformer tank from inside with two coats of zinc chromite after preparing the tank walls bottom top cover inner side by properly cleaning the surfaces oil free complete all as directed for transformer capacity 400 kva, m and l for replacement of defective ht porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, m and l for replacement of defective lt porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, dehydration and filteration of transformer oil for indoor outdoor type transformers of any capacity at site using transformer oil filteration plant to improve di electric strength not less than 45 kv at 2 point 5 mm electrode gap complete all as directed note unit rate quoted shall be deemed to include the charges for hiring of oil filteration plant shifting to different locations at cantt area testing of samples of oil as per requirement and nothing extra will be paid on this account, s and f new transformer oil for replacement or topping up the level of oil having dielectric strength not less than 45 complete all as specified and directed. While many public sector projects allow national competitive bidding, certain localized works require local offices or specific registration metrics in Shimla.

5.

Do I need an active GeM Portal registration to apply for this work?

If this procurement is routed through the central marketplace, an active GeM Seller ID is mandatory to supply items. Tender18 offers complete assistance for brand cataloging, profile creation, and vendor assessment required officially by Indian army

6.

What are the primary legal documents required to submit a valid bid?

To register an eligible bid for these contracts, companies must prepare their core compliance documents. Vendors operating across Himachal pradesh must ensure they possess a valid GST registration, permanent account number (PAN), and active Class-3 Digital Signature Certificates.

7.

What products or services are required for this active work?

This public procurement cycle is specifically looking for qualified vendors and suppliers who can provide high-quality solutions. The operational execution, delivery, and deployment of these materials must be managed locally within the Shimla region.

8.

Where can I review the estimated cost or budget details for this Tender?

The estimated project cost and budget thresholds can be reviewed directly inside the tender document. Bidders can analyze these qualification files to check if their firm meets the financial capability criteria specified for tender for title1 , title2 , title3 , title4 , title5 , title6 , title7 , title8 , title9 , title10, repair of transformer, disconnecting ht and lt supply taking down the defective transformer indoor outdoor type from four pole two pole structure or lifting from the outdoor type foundation or taking out from sub station bldg using a crane of suitable capacity and slings ropes etc as required and shifting the same to civil workshop for repairs complete all as directed for transformer capacity 400 kva, shifting back the repaired transformer indoor outdoor type from civil workshop to site reinstalling at original position and fixing properly on four pole two pole structure or outdoor type foundation or inside a sub station bldg using a crane of suitable capacity and slings ropes etc as required making ht lt side connections and testing for satisfactorily working complete all as directed for transformer of capacity 400 kva, draining out transformer oil from the transformer and storing the same in suitable containers to be arranged by contractor without any extra cost opening the top cover and lifting up the core assembly carefully to check the condition of transformer windings and core retanking the same after repairing checking of leakage from transformer body and repairing welding works required for making transformer body leak proof refilling the transformer oil dully dehydrated and filtered dehydration and filteration to be paid separately and making all connections with ht lt side bushings refixing the top cover and testing the transformer with a suitable capacity insulation tester complete all as directed for transformer of cap 400 kva, m and l for rewinding of burnt out defective ht copper coils with new super enamelled heavy duty copper winding wires of size matching to the existing one including varnishing drying in a suitable oven and all insulating material such as cotton sleeves tapes etc and connections with bushing terminals complete all as specified and directed, all as per item no 4 above but lt copper coils complete all as specified and directed, m and l for painting the transformer tank from inside with two coats of zinc chromite after preparing the tank walls bottom top cover inner side by properly cleaning the surfaces oil free complete all as directed for transformer capacity 400 kva, m and l for replacement of defective ht porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, m and l for replacement of defective lt porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, dehydration and filteration of transformer oil for indoor outdoor type transformers of any capacity at site using transformer oil filteration plant to improve di electric strength not less than 45 kv at 2 point 5 mm electrode gap complete all as directed note unit rate quoted shall be deemed to include the charges for hiring of oil filteration plant shifting to different locations at cantt area testing of samples of oil as per requirement and nothing extra will be paid on this account, s and f new transformer oil for replacement or topping up the level of oil having dielectric strength not less than 45 complete all as specified and directed by Indian army

9.

How can I download the official BOQ file for this opportunity?

You can download the commercial Bill of Quantities (BOQ) spreadsheet directly using the secure link provided on this page. The BOQ file contains the item descriptions and rate filling forms officially validated for tender for title1 , title2 , title3 , title4 , title5 , title6 , title7 , title8 , title9 , title10, repair of transformer, disconnecting ht and lt supply taking down the defective transformer indoor outdoor type from four pole two pole structure or lifting from the outdoor type foundation or taking out from sub station bldg using a crane of suitable capacity and slings ropes etc as required and shifting the same to civil workshop for repairs complete all as directed for transformer capacity 400 kva, shifting back the repaired transformer indoor outdoor type from civil workshop to site reinstalling at original position and fixing properly on four pole two pole structure or outdoor type foundation or inside a sub station bldg using a crane of suitable capacity and slings ropes etc as required making ht lt side connections and testing for satisfactorily working complete all as directed for transformer of capacity 400 kva, draining out transformer oil from the transformer and storing the same in suitable containers to be arranged by contractor without any extra cost opening the top cover and lifting up the core assembly carefully to check the condition of transformer windings and core retanking the same after repairing checking of leakage from transformer body and repairing welding works required for making transformer body leak proof refilling the transformer oil dully dehydrated and filtered dehydration and filteration to be paid separately and making all connections with ht lt side bushings refixing the top cover and testing the transformer with a suitable capacity insulation tester complete all as directed for transformer of cap 400 kva, m and l for rewinding of burnt out defective ht copper coils with new super enamelled heavy duty copper winding wires of size matching to the existing one including varnishing drying in a suitable oven and all insulating material such as cotton sleeves tapes etc and connections with bushing terminals complete all as specified and directed, all as per item no 4 above but lt copper coils complete all as specified and directed, m and l for painting the transformer tank from inside with two coats of zinc chromite after preparing the tank walls bottom top cover inner side by properly cleaning the surfaces oil free complete all as directed for transformer capacity 400 kva, m and l for replacement of defective ht porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, m and l for replacement of defective lt porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, dehydration and filteration of transformer oil for indoor outdoor type transformers of any capacity at site using transformer oil filteration plant to improve di electric strength not less than 45 kv at 2 point 5 mm electrode gap complete all as directed note unit rate quoted shall be deemed to include the charges for hiring of oil filteration plant shifting to different locations at cantt area testing of samples of oil as per requirement and nothing extra will be paid on this account, s and f new transformer oil for replacement or topping up the level of oil having dielectric strength not less than 45 complete all as specified and directed within the Himachal pradesh jurisdiction

10.

How can I find the submission closing date for this contract?

The official timeline and deadline details for tender for title1 , title2 , title3 , title4 , title5 , title6 , title7 , title8 , title9 , title10, repair of transformer, disconnecting ht and lt supply taking down the defective transformer indoor outdoor type from four pole two pole structure or lifting from the outdoor type foundation or taking out from sub station bldg using a crane of suitable capacity and slings ropes etc as required and shifting the same to civil workshop for repairs complete all as directed for transformer capacity 400 kva, shifting back the repaired transformer indoor outdoor type from civil workshop to site reinstalling at original position and fixing properly on four pole two pole structure or outdoor type foundation or inside a sub station bldg using a crane of suitable capacity and slings ropes etc as required making ht lt side connections and testing for satisfactorily working complete all as directed for transformer of capacity 400 kva, draining out transformer oil from the transformer and storing the same in suitable containers to be arranged by contractor without any extra cost opening the top cover and lifting up the core assembly carefully to check the condition of transformer windings and core retanking the same after repairing checking of leakage from transformer body and repairing welding works required for making transformer body leak proof refilling the transformer oil dully dehydrated and filtered dehydration and filteration to be paid separately and making all connections with ht lt side bushings refixing the top cover and testing the transformer with a suitable capacity insulation tester complete all as directed for transformer of cap 400 kva, m and l for rewinding of burnt out defective ht copper coils with new super enamelled heavy duty copper winding wires of size matching to the existing one including varnishing drying in a suitable oven and all insulating material such as cotton sleeves tapes etc and connections with bushing terminals complete all as specified and directed, all as per item no 4 above but lt copper coils complete all as specified and directed, m and l for painting the transformer tank from inside with two coats of zinc chromite after preparing the tank walls bottom top cover inner side by properly cleaning the surfaces oil free complete all as directed for transformer capacity 400 kva, m and l for replacement of defective ht porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, m and l for replacement of defective lt porcelain bushing of suitable size for transformer of cap 400 kva including washers of good quality complete all as specified and directed, dehydration and filteration of transformer oil for indoor outdoor type transformers of any capacity at site using transformer oil filteration plant to improve di electric strength not less than 45 kv at 2 point 5 mm electrode gap complete all as directed note unit rate quoted shall be deemed to include the charges for hiring of oil filteration plant shifting to different locations at cantt area testing of samples of oil as per requirement and nothing extra will be paid on this account, s and f new transformer oil for replacement or topping up the level of oil having dielectric strength not less than 45 complete all as specified and directed are available inside the detailed notification files. Bidders planning to target this contract in Shimla should check the official portal schedule early to complete their online technical and financial submission well before the closing hours.

Tender Inquiry