tender for soil investigation and sampling , borehole drilling and sbc analysis , soil laboratory testing physical , soil chemical analysis , soil engineering properties test , water level test , comprehensive soil report and sbc , foundation mapping , mobilization and final certification, soil investigation, to carry out soil investigation and collection of samples in all types of strata including distrubed, undistrubed soil sampling, conduction of standard penetration test (spt), visual classification at regular interval, determine the safe bearing capacity complete with field and laboratory tests on soil/ rock samples including trail pit 1.20m x 1.20m x 3.0m investigation to relevant specification of is 2131, is 6403, is 1498 is 2720, conducting soil investigation for the following - (a) 150mm dia meter bore holes as per is specification (b) bore hole. (i) depth of bore hole 15.00 mtr (core drilling by calyx rig) (ii) to suggest sbc for isolated footing 1.5x1.5, 2.0x2.0, 2.5x2.5 mtr at 1.5m, 2.0m, 2.5m depth strip depth strip footing of 1.5 2.0 mtr. (iii) water table (iv) expansive nature of soil with respect plasticity index (v) n value at 2.5m, 3.0m, 6.0m, 12.0m (vi) bore log of soil strata upto 15.0 mtr depth, (c) collection of distrubed and undistrubed soil sample at interval of 1.00 mtr at change of relevant specification of is 2720., (d) conduction lab test on distrubed soil sample at interval of 1.00 mtr or at change of strata or as per relevant is code. (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density, (e) conducting lab test on undistrubed soil sample as considered necessary according to relevant specification of is 2720 - (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density (vi) specific gravity (vii) free swell index and swelling property of soil (viii) organic matter in any soil, in any (ix) consolidation test (compressed index value) (x) trixial compression test and determination of shear parameters (construction of ) test as per relevant is. (xi) harful salt (complete investigation as already ref)., (f) ground water table - (i) maximum and minimum levels of ground water in the area with sources of information. (ii) ground water table during investigation., (g) submission of six copies of test reports with detailed description of field investigation, soil classification and general nature of soil strata, water table, interpretation of test results, grains size, distribution curves, compressive index curves, site plan etc. (h) the sbc of the soil is required to be given as per following table. calculation of bearing capacity will be governed generally as per is 8009 (pt-i) 1976, is-2720 (pt-ii) 1980, is 6403-1981, is 1904-1984 is 1904-1984 and is 1080-1985 and other relevant is code., (j) with every sites soil investigation report, a detailed site plan showing the approx location of each bore duly numbered as per log of bore hole should be enclosed. location of foundation of adjacent structures, especially those that might be impacted by the proposed construction. (k) every page of the soil investigation report should have the name of the job for which soil investigation is being carried out. in case of multiple sites of a single job are being investigated name of each site shall be put on each page of report pertaining to the site., (l) all pages of the soil investigation report shall be serially numbered, stamped and signed by the agency carrying out the soil investigation. report should be scrutinised by ge and cwe for correctness and endorse. (m) mobilisation of tools and equipments, machineries, manpowers etc to site location and demolition from site after completion of work.

Latest Tender Detail from indian army for the tender for soil investigation and sampling , borehole drilling and sbc analysis , soil laboratory testing physical , soil chemical analysis , soil engineering properties test , water level test , comprehensive soil report and sbc , foundation mapping , mobilization and final certification, soil investigation, to carry out soil investigation and collection of samples in all types of strata including distrubed, undistrubed soil sampling, conduction of standard penetration test (spt), visual classification at regular interval, determine the safe bearing capacity complete with field and laboratory tests on soil/ rock samples including trail pit 1.20m x 1.20m x 3.0m investigation to relevant specification of is 2131, is 6403, is 1498 is 2720, conducting soil investigation for the following - (a) 150mm dia meter bore holes as per is specification (b) bore hole. (i) depth of bore hole 15.00 mtr (core drilling by calyx rig) (ii) to suggest sbc for isolated footing 1.5x1.5, 2.0x2.0, 2.5x2.5 mtr at 1.5m, 2.0m, 2.5m depth strip depth strip footing of 1.5 2.0 mtr. (iii) water table (iv) expansive nature of soil with respect plasticity index (v) n value at 2.5m, 3.0m, 6.0m, 12.0m (vi) bore log of soil strata upto 15.0 mtr depth, (c) collection of distrubed and undistrubed soil sample at interval of 1.00 mtr at change of relevant specification of is 2720., (d) conduction lab test on distrubed soil sample at interval of 1.00 mtr or at change of strata or as per relevant is code. (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density, (e) conducting lab test on undistrubed soil sample as considered necessary according to relevant specification of is 2720 - (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density (vi) specific gravity (vii) free swell index and swelling property of soil (viii) organic matter in any soil, in any (ix) consolidation test (compressed index value) (x) trixial compression test and determination of shear parameters (construction of ) test as per relevant is. (xi) harful salt (complete investigation as already ref)., (f) ground water table - (i) maximum and minimum levels of ground water in the area with sources of information. (ii) ground water table during investigation., (g) submission of six copies of test reports with detailed description of field investigation, soil classification and general nature of soil strata, water table, interpretation of test results, grains size, distribution curves, compressive index curves, site plan etc. (h) the sbc of the soil is required to be given as per following table. calculation of bearing capacity will be governed generally as per is 8009 (pt-i) 1976, is-2720 (pt-ii) 1980, is 6403-1981, is 1904-1984 is 1904-1984 and is 1080-1985 and other relevant is code., (j) with every sites soil investigation report, a detailed site plan showing the approx location of each bore duly numbered as per log of bore hole should be enclosed. location of foundation of adjacent structures, especially those that might be impacted by the proposed construction. (k) every page of the soil investigation report should have the name of the job for which soil investigation is being carried out. in case of multiple sites of a single job are being investigated name of each site shall be put on each page of report pertaining to the site., (l) all pages of the soil investigation report shall be serially numbered, stamped and signed by the agency carrying out the soil investigation. report should be scrutinised by ge and cwe for correctness and endorse. (m) mobilisation of tools and equipments, machineries, manpowers etc to site location and demolition from site after completion of work. in gurgaon, haryana,. Reference number 15157516. Don't miss out on this chance to be part of a significant project. Register for free today to access the complete tender details and download the necessary documents. Seize the opportunity with Tender 18!

T18 Ref No:15157516
Tender ID:GEM/2026/B/7480815
Tender Agency:indian army
City:gurgaon
State:haryana
Description :total quantity = 18 ----- document required from seller = experience criteria,past performance,bidder turnover,certificate (requested in atc),oem authorization certificate,oem annual turnover,additional doc 1 (requested in atc) ----- evaluation method = total value wise evaluation
Tender Value:Refer Document
Tender EMD:Refer Document
Tender Fee:Refer Document
Published Date:Apr 27, 2026
Due Date:May 08, 2026
Tender Opening Date:May 08, 2026
T18 Ref No:15157516Tender Value:Refer Document
Tender ID:GEM/2026/B/7480815Tender EMD:Refer Document
Tender Agency:indian armyTender Fee:Refer Document
City:gurgaonPublished Date:Apr 27, 2026
State:haryanaDue Date:May 08, 2026
Tender Related Keywords :-Tender Opening Date:May 08, 2026
Description :total quantity = 18 ----- document required from seller = experience criteria,past performance,bidder turnover,certificate (requested in atc),oem authorization certificate,oem annual turnover,additional doc 1 (requested in atc) ----- evaluation method = total value wise evaluation
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

This Government Tender has been Published  by Indian army for work related to in Gurgaon, Haryana. The Tender work is tender for soil investigation and sampling , borehole drilling and sbc analysis , soil laboratory testing physical , soil chemical analysis , soil engineering properties test , water level test , comprehensive soil report and sbc , foundation mapping , mobilization and final certification, soil investigation, to carry out soil investigation and collection of samples in all types of strata including distrubed, undistrubed soil sampling, conduction of standard penetration test (spt), visual classification at regular interval, determine the safe bearing capacity complete with field and laboratory tests on soil/ rock samples including trail pit 1.20m x 1.20m x 3.0m investigation to relevant specification of is 2131, is 6403, is 1498 is 2720, conducting soil investigation for the following - (a) 150mm dia meter bore holes as per is specification (b) bore hole. (i) depth of bore hole 15.00 mtr (core drilling by calyx rig) (ii) to suggest sbc for isolated footing 1.5x1.5, 2.0x2.0, 2.5x2.5 mtr at 1.5m, 2.0m, 2.5m depth strip depth strip footing of 1.5 2.0 mtr. (iii) water table (iv) expansive nature of soil with respect plasticity index (v) n value at 2.5m, 3.0m, 6.0m, 12.0m (vi) bore log of soil strata upto 15.0 mtr depth, (c) collection of distrubed and undistrubed soil sample at interval of 1.00 mtr at change of relevant specification of is 2720., (d) conduction lab test on distrubed soil sample at interval of 1.00 mtr or at change of strata or as per relevant is code. (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density, (e) conducting lab test on undistrubed soil sample as considered necessary according to relevant specification of is 2720 - (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density (vi) specific gravity (vii) free swell index and swelling property of soil (viii) organic matter in any soil, in any (ix) consolidation test (compressed index value) (x) trixial compression test and determination of shear parameters (construction of ) test as per relevant is. (xi) harful salt (complete investigation as already ref)., (f) ground water table - (i) maximum and minimum levels of ground water in the area with sources of information. (ii) ground water table during investigation., (g) submission of six copies of test reports with detailed description of field investigation, soil classification and general nature of soil strata, water table, interpretation of test results, grains size, distribution curves, compressive index curves, site plan etc. (h) the sbc of the soil is required to be given as per following table. calculation of bearing capacity will be governed generally as per is 8009 (pt-i) 1976, is-2720 (pt-ii) 1980, is 6403-1981, is 1904-1984 is 1904-1984 and is 1080-1985 and other relevant is code., (j) with every sites soil investigation report, a detailed site plan showing the approx location of each bore duly numbered as per log of bore hole should be enclosed. location of foundation of adjacent structures, especially those that might be impacted by the proposed construction. (k) every page of the soil investigation report should have the name of the job for which soil investigation is being carried out. in case of multiple sites of a single job are being investigated name of each site shall be put on each page of report pertaining to the site., (l) all pages of the soil investigation report shall be serially numbered, stamped and signed by the agency carrying out the soil investigation. report should be scrutinised by ge and cwe for correctness and endorse. (m) mobilisation of tools and equipments, machineries, manpowers etc to site location and demolition from site after completion of work.. Tender18 Provide this type Government Tender Information on daily basis.


This tender invites eligible contractors, suppliers, manufacturers, consultants, Startups, Msmes, traders and service providers to submit bids for the specified project, supply, service, or work requirement.


Before applying, interested bidders should review the tender scope, eligibility criteria, estimated contract value, important dates, technical requirements, reqired docuent list for bidder and bid submission instructions as per provided in the official tender documents. 


This Verified Information Provide By Tender18 in this page so Bidder Can Easiy  Understanding tender  requirements and bidders can prepare a compliant and competitive tender proposal.

To participate in the tender for soil investigation and sampling , borehole drilling and sbc analysis , soil laboratory testing physical , soil chemical analysis , soil engineering properties test , water level test , comprehensive soil report and sbc , foundation mapping , mobilization and final certification, soil investigation, to carry out soil investigation and collection of samples in all types of strata including distrubed, undistrubed soil sampling, conduction of standard penetration test (spt), visual classification at regular interval, determine the safe bearing capacity complete with field and laboratory tests on soil/ rock samples including trail pit 1.20m x 1.20m x 3.0m investigation to relevant specification of is 2131, is 6403, is 1498 is 2720, conducting soil investigation for the following - (a) 150mm dia meter bore holes as per is specification (b) bore hole. (i) depth of bore hole 15.00 mtr (core drilling by calyx rig) (ii) to suggest sbc for isolated footing 1.5x1.5, 2.0x2.0, 2.5x2.5 mtr at 1.5m, 2.0m, 2.5m depth strip depth strip footing of 1.5 2.0 mtr. (iii) water table (iv) expansive nature of soil with respect plasticity index (v) n value at 2.5m, 3.0m, 6.0m, 12.0m (vi) bore log of soil strata upto 15.0 mtr depth, (c) collection of distrubed and undistrubed soil sample at interval of 1.00 mtr at change of relevant specification of is 2720., (d) conduction lab test on distrubed soil sample at interval of 1.00 mtr or at change of strata or as per relevant is code. (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density, (e) conducting lab test on undistrubed soil sample as considered necessary according to relevant specification of is 2720 - (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density (vi) specific gravity (vii) free swell index and swelling property of soil (viii) organic matter in any soil, in any (ix) consolidation test (compressed index value) (x) trixial compression test and determination of shear parameters (construction of ) test as per relevant is. (xi) harful salt (complete investigation as already ref)., (f) ground water table - (i) maximum and minimum levels of ground water in the area with sources of information. (ii) ground water table during investigation., (g) submission of six copies of test reports with detailed description of field investigation, soil classification and general nature of soil strata, water table, interpretation of test results, grains size, distribution curves, compressive index curves, site plan etc. (h) the sbc of the soil is required to be given as per following table. calculation of bearing capacity will be governed generally as per is 8009 (pt-i) 1976, is-2720 (pt-ii) 1980, is 6403-1981, is 1904-1984 is 1904-1984 and is 1080-1985 and other relevant is code., (j) with every sites soil investigation report, a detailed site plan showing the approx location of each bore duly numbered as per log of bore hole should be enclosed. location of foundation of adjacent structures, especially those that might be impacted by the proposed construction. (k) every page of the soil investigation report should have the name of the job for which soil investigation is being carried out. in case of multiple sites of a single job are being investigated name of each site shall be put on each page of report pertaining to the site., (l) all pages of the soil investigation report shall be serially numbered, stamped and signed by the agency carrying out the soil investigation. report should be scrutinised by ge and cwe for correctness and endorse. (m) mobilisation of tools and equipments, machineries, manpowers etc to site location and demolition from site after completion of work., bidders should first download and review all available tender documents. These documents generally include the Notice Inviting Tender (NIT), Bill of Quantities (BOQ), technical specifications, eligibility criteria, scope of work, and bid submission instructions.


Tender Governemnt Authorities like Indian army usually publish these documents on their official eProcurement portals, departmental tender portals, the GeM Tender Portal, or other government procurement platforms or on newspapre. Finding and accessing the correct tender documents across multiple portals can sometimes be time-consuming for bidders. 


To make the process easier, Tender18 provides quick access to the available tender documents related to this Gurgaon , Haryana tender on a single page. Businesses involved in related products, services, or works can conveniently download the relevant documents and review the tender requirements without spending time searching across different procurement portals.

The tender for soil investigation and sampling , borehole drilling and sbc analysis , soil laboratory testing physical , soil chemical analysis , soil engineering properties test , water level test , comprehensive soil report and sbc , foundation mapping , mobilization and final certification, soil investigation, to carry out soil investigation and collection of samples in all types of strata including distrubed, undistrubed soil sampling, conduction of standard penetration test (spt), visual classification at regular interval, determine the safe bearing capacity complete with field and laboratory tests on soil/ rock samples including trail pit 1.20m x 1.20m x 3.0m investigation to relevant specification of is 2131, is 6403, is 1498 is 2720, conducting soil investigation for the following - (a) 150mm dia meter bore holes as per is specification (b) bore hole. (i) depth of bore hole 15.00 mtr (core drilling by calyx rig) (ii) to suggest sbc for isolated footing 1.5x1.5, 2.0x2.0, 2.5x2.5 mtr at 1.5m, 2.0m, 2.5m depth strip depth strip footing of 1.5 2.0 mtr. (iii) water table (iv) expansive nature of soil with respect plasticity index (v) n value at 2.5m, 3.0m, 6.0m, 12.0m (vi) bore log of soil strata upto 15.0 mtr depth, (c) collection of distrubed and undistrubed soil sample at interval of 1.00 mtr at change of relevant specification of is 2720., (d) conduction lab test on distrubed soil sample at interval of 1.00 mtr or at change of strata or as per relevant is code. (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density, (e) conducting lab test on undistrubed soil sample as considered necessary according to relevant specification of is 2720 - (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density (vi) specific gravity (vii) free swell index and swelling property of soil (viii) organic matter in any soil, in any (ix) consolidation test (compressed index value) (x) trixial compression test and determination of shear parameters (construction of ) test as per relevant is. (xi) harful salt (complete investigation as already ref)., (f) ground water table - (i) maximum and minimum levels of ground water in the area with sources of information. (ii) ground water table during investigation., (g) submission of six copies of test reports with detailed description of field investigation, soil classification and general nature of soil strata, water table, interpretation of test results, grains size, distribution curves, compressive index curves, site plan etc. (h) the sbc of the soil is required to be given as per following table. calculation of bearing capacity will be governed generally as per is 8009 (pt-i) 1976, is-2720 (pt-ii) 1980, is 6403-1981, is 1904-1984 is 1904-1984 and is 1080-1985 and other relevant is code., (j) with every sites soil investigation report, a detailed site plan showing the approx location of each bore duly numbered as per log of bore hole should be enclosed. location of foundation of adjacent structures, especially those that might be impacted by the proposed construction. (k) every page of the soil investigation report should have the name of the job for which soil investigation is being carried out. in case of multiple sites of a single job are being investigated name of each site shall be put on each page of report pertaining to the site., (l) all pages of the soil investigation report shall be serially numbered, stamped and signed by the agency carrying out the soil investigation. report should be scrutinised by ge and cwe for correctness and endorse. (m) mobilisation of tools and equipments, machineries, manpowers etc to site location and demolition from site after completion of work. from Gurgaon, Haryana may be relevant for contractors, suppliers, vendors, manufacturers, consultants, service providers, startups, MSMEs, and other organizations involved in related products, services, or works. However, eligibility to participate depends on the qualification criteria specified by Indian army in the official tender documents.

Before submitting a bid, interested applicants should carefully review the eligibility conditions, technical requirements, financial criteria, work experience requirements, annual turnover conditions, registrations, certifications, and any other supporting documents required by the tendering authority. The detailed qualification requirements and bidder eligibility criteria are available in the tender notice and related documents provided on this page. 

Ensuring compliance with all eligibility and qualification requirements before bid submission can help bidders avoid disqualification and improve their chances of successful participation in the tender process.

Tende18 provides comprehensive tender bidding services, including a complete tender summary along with a detailed analysis of the Tender Qualification and Eligibility Criteria.

Interested in participating in the tender for soil investigation and sampling , borehole drilling and sbc analysis , soil laboratory testing physical , soil chemical analysis , soil engineering properties test , water level test , comprehensive soil report and sbc , foundation mapping , mobilization and final certification, soil investigation, to carry out soil investigation and collection of samples in all types of strata including distrubed, undistrubed soil sampling, conduction of standard penetration test (spt), visual classification at regular interval, determine the safe bearing capacity complete with field and laboratory tests on soil/ rock samples including trail pit 1.20m x 1.20m x 3.0m investigation to relevant specification of is 2131, is 6403, is 1498 is 2720, conducting soil investigation for the following - (a) 150mm dia meter bore holes as per is specification (b) bore hole. (i) depth of bore hole 15.00 mtr (core drilling by calyx rig) (ii) to suggest sbc for isolated footing 1.5x1.5, 2.0x2.0, 2.5x2.5 mtr at 1.5m, 2.0m, 2.5m depth strip depth strip footing of 1.5 2.0 mtr. (iii) water table (iv) expansive nature of soil with respect plasticity index (v) n value at 2.5m, 3.0m, 6.0m, 12.0m (vi) bore log of soil strata upto 15.0 mtr depth, (c) collection of distrubed and undistrubed soil sample at interval of 1.00 mtr at change of relevant specification of is 2720., (d) conduction lab test on distrubed soil sample at interval of 1.00 mtr or at change of strata or as per relevant is code. (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density, (e) conducting lab test on undistrubed soil sample as considered necessary according to relevant specification of is 2720 - (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density (vi) specific gravity (vii) free swell index and swelling property of soil (viii) organic matter in any soil, in any (ix) consolidation test (compressed index value) (x) trixial compression test and determination of shear parameters (construction of ) test as per relevant is. (xi) harful salt (complete investigation as already ref)., (f) ground water table - (i) maximum and minimum levels of ground water in the area with sources of information. (ii) ground water table during investigation., (g) submission of six copies of test reports with detailed description of field investigation, soil classification and general nature of soil strata, water table, interpretation of test results, grains size, distribution curves, compressive index curves, site plan etc. (h) the sbc of the soil is required to be given as per following table. calculation of bearing capacity will be governed generally as per is 8009 (pt-i) 1976, is-2720 (pt-ii) 1980, is 6403-1981, is 1904-1984 is 1904-1984 and is 1080-1985 and other relevant is code., (j) with every sites soil investigation report, a detailed site plan showing the approx location of each bore duly numbered as per log of bore hole should be enclosed. location of foundation of adjacent structures, especially those that might be impacted by the proposed construction. (k) every page of the soil investigation report should have the name of the job for which soil investigation is being carried out. in case of multiple sites of a single job are being investigated name of each site shall be put on each page of report pertaining to the site., (l) all pages of the soil investigation report shall be serially numbered, stamped and signed by the agency carrying out the soil investigation. report should be scrutinised by ge and cwe for correctness and endorse. (m) mobilisation of tools and equipments, machineries, manpowers etc to site location and demolition from site after completion of work. issued by Indian army for related work in Gurgaon, Haryana? TENDER18 provides complete assistance to help businesses understand tender requirements, access tender documents, review eligibility criteria, qualification requirements, important dates, and bid submission guidelines associated with this tender.

Our Tender18 Expert Technical team can assist with vendor and GeM registration on the relevant departmental, eProcurement, GeM, or government tender portal, preparation of technical and financial bid documents, compliance with qualification criteria, document verification, and complete online tender submission support. Whether you are a contractor, supplier, manufacturer, consultant, startup, or MSME working in the field of , Tender18 can help simplify the tender participation process and support you throughout every stage of bidding for this tender. so that tender18 is one the top leading tender consultant in Inda.

1.

Whom should I contact if I have further queries about the Tender scope?

You can fill out the integrated inquiry form below on this detail page to share your company profile. Our consultancy desk will review your query regarding parameters and guide you on how to coordinate efficiently with the procurement team of Indian army

2.

How can Tender18 assist my business in winning this government contract?

Tender18 provides end-to-end professional bidding support and documentation advisory for tender for soil investigation and sampling , borehole drilling and sbc analysis , soil laboratory testing physical , soil chemical analysis , soil engineering properties test , water level test , comprehensive soil report and sbc , foundation mapping , mobilization and final certification, soil investigation, to carry out soil investigation and collection of samples in all types of strata including distrubed, undistrubed soil sampling, conduction of standard penetration test (spt), visual classification at regular interval, determine the safe bearing capacity complete with field and laboratory tests on soil/ rock samples including trail pit 1.20m x 1.20m x 3.0m investigation to relevant specification of is 2131, is 6403, is 1498 is 2720, conducting soil investigation for the following - (a) 150mm dia meter bore holes as per is specification (b) bore hole. (i) depth of bore hole 15.00 mtr (core drilling by calyx rig) (ii) to suggest sbc for isolated footing 1.5x1.5, 2.0x2.0, 2.5x2.5 mtr at 1.5m, 2.0m, 2.5m depth strip depth strip footing of 1.5 2.0 mtr. (iii) water table (iv) expansive nature of soil with respect plasticity index (v) n value at 2.5m, 3.0m, 6.0m, 12.0m (vi) bore log of soil strata upto 15.0 mtr depth, (c) collection of distrubed and undistrubed soil sample at interval of 1.00 mtr at change of relevant specification of is 2720., (d) conduction lab test on distrubed soil sample at interval of 1.00 mtr or at change of strata or as per relevant is code. (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density, (e) conducting lab test on undistrubed soil sample as considered necessary according to relevant specification of is 2720 - (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density (vi) specific gravity (vii) free swell index and swelling property of soil (viii) organic matter in any soil, in any (ix) consolidation test (compressed index value) (x) trixial compression test and determination of shear parameters (construction of ) test as per relevant is. (xi) harful salt (complete investigation as already ref)., (f) ground water table - (i) maximum and minimum levels of ground water in the area with sources of information. (ii) ground water table during investigation., (g) submission of six copies of test reports with detailed description of field investigation, soil classification and general nature of soil strata, water table, interpretation of test results, grains size, distribution curves, compressive index curves, site plan etc. (h) the sbc of the soil is required to be given as per following table. calculation of bearing capacity will be governed generally as per is 8009 (pt-i) 1976, is-2720 (pt-ii) 1980, is 6403-1981, is 1904-1984 is 1904-1984 and is 1080-1985 and other relevant is code., (j) with every sites soil investigation report, a detailed site plan showing the approx location of each bore duly numbered as per log of bore hole should be enclosed. location of foundation of adjacent structures, especially those that might be impacted by the proposed construction. (k) every page of the soil investigation report should have the name of the job for which soil investigation is being carried out. in case of multiple sites of a single job are being investigated name of each site shall be put on each page of report pertaining to the site., (l) all pages of the soil investigation report shall be serially numbered, stamped and signed by the agency carrying out the soil investigation. report should be scrutinised by ge and cwe for correctness and endorse. (m) mobilisation of tools and equipments, machineries, manpowers etc to site location and demolition from site after completion of work. . Our senior analysts help you decode the complete project guidelines, manage accurate costing sheets, and complete error-free submissions on the official platform used by Indian army.

3.

What are the main reasons for a technical tender rejection?

Most online bids face rejection during the initial evaluation round due to avoidable errors like uploading blurred document scans, submitting expired DSCs, or missing critical experience papers required for tender for soil investigation and sampling , borehole drilling and sbc analysis , soil laboratory testing physical , soil chemical analysis , soil engineering properties test , water level test , comprehensive soil report and sbc , foundation mapping , mobilization and final certification, soil investigation, to carry out soil investigation and collection of samples in all types of strata including distrubed, undistrubed soil sampling, conduction of standard penetration test (spt), visual classification at regular interval, determine the safe bearing capacity complete with field and laboratory tests on soil/ rock samples including trail pit 1.20m x 1.20m x 3.0m investigation to relevant specification of is 2131, is 6403, is 1498 is 2720, conducting soil investigation for the following - (a) 150mm dia meter bore holes as per is specification (b) bore hole. (i) depth of bore hole 15.00 mtr (core drilling by calyx rig) (ii) to suggest sbc for isolated footing 1.5x1.5, 2.0x2.0, 2.5x2.5 mtr at 1.5m, 2.0m, 2.5m depth strip depth strip footing of 1.5 2.0 mtr. (iii) water table (iv) expansive nature of soil with respect plasticity index (v) n value at 2.5m, 3.0m, 6.0m, 12.0m (vi) bore log of soil strata upto 15.0 mtr depth, (c) collection of distrubed and undistrubed soil sample at interval of 1.00 mtr at change of relevant specification of is 2720., (d) conduction lab test on distrubed soil sample at interval of 1.00 mtr or at change of strata or as per relevant is code. (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density, (e) conducting lab test on undistrubed soil sample as considered necessary according to relevant specification of is 2720 - (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density (vi) specific gravity (vii) free swell index and swelling property of soil (viii) organic matter in any soil, in any (ix) consolidation test (compressed index value) (x) trixial compression test and determination of shear parameters (construction of ) test as per relevant is. (xi) harful salt (complete investigation as already ref)., (f) ground water table - (i) maximum and minimum levels of ground water in the area with sources of information. (ii) ground water table during investigation., (g) submission of six copies of test reports with detailed description of field investigation, soil classification and general nature of soil strata, water table, interpretation of test results, grains size, distribution curves, compressive index curves, site plan etc. (h) the sbc of the soil is required to be given as per following table. calculation of bearing capacity will be governed generally as per is 8009 (pt-i) 1976, is-2720 (pt-ii) 1980, is 6403-1981, is 1904-1984 is 1904-1984 and is 1080-1985 and other relevant is code., (j) with every sites soil investigation report, a detailed site plan showing the approx location of each bore duly numbered as per log of bore hole should be enclosed. location of foundation of adjacent structures, especially those that might be impacted by the proposed construction. (k) every page of the soil investigation report should have the name of the job for which soil investigation is being carried out. in case of multiple sites of a single job are being investigated name of each site shall be put on each page of report pertaining to the site., (l) all pages of the soil investigation report shall be serially numbered, stamped and signed by the agency carrying out the soil investigation. report should be scrutinised by ge and cwe for correctness and endorse. (m) mobilisation of tools and equipments, machineries, manpowers etc to site location and demolition from site after completion of work. in Haryana.

4.

Can contractors located outside the local region participate in this bid?

Eligibility for outstation bidders depends entirely on the terms set inside the document for tender for soil investigation and sampling , borehole drilling and sbc analysis , soil laboratory testing physical , soil chemical analysis , soil engineering properties test , water level test , comprehensive soil report and sbc , foundation mapping , mobilization and final certification, soil investigation, to carry out soil investigation and collection of samples in all types of strata including distrubed, undistrubed soil sampling, conduction of standard penetration test (spt), visual classification at regular interval, determine the safe bearing capacity complete with field and laboratory tests on soil/ rock samples including trail pit 1.20m x 1.20m x 3.0m investigation to relevant specification of is 2131, is 6403, is 1498 is 2720, conducting soil investigation for the following - (a) 150mm dia meter bore holes as per is specification (b) bore hole. (i) depth of bore hole 15.00 mtr (core drilling by calyx rig) (ii) to suggest sbc for isolated footing 1.5x1.5, 2.0x2.0, 2.5x2.5 mtr at 1.5m, 2.0m, 2.5m depth strip depth strip footing of 1.5 2.0 mtr. (iii) water table (iv) expansive nature of soil with respect plasticity index (v) n value at 2.5m, 3.0m, 6.0m, 12.0m (vi) bore log of soil strata upto 15.0 mtr depth, (c) collection of distrubed and undistrubed soil sample at interval of 1.00 mtr at change of relevant specification of is 2720., (d) conduction lab test on distrubed soil sample at interval of 1.00 mtr or at change of strata or as per relevant is code. (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density, (e) conducting lab test on undistrubed soil sample as considered necessary according to relevant specification of is 2720 - (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density (vi) specific gravity (vii) free swell index and swelling property of soil (viii) organic matter in any soil, in any (ix) consolidation test (compressed index value) (x) trixial compression test and determination of shear parameters (construction of ) test as per relevant is. (xi) harful salt (complete investigation as already ref)., (f) ground water table - (i) maximum and minimum levels of ground water in the area with sources of information. (ii) ground water table during investigation., (g) submission of six copies of test reports with detailed description of field investigation, soil classification and general nature of soil strata, water table, interpretation of test results, grains size, distribution curves, compressive index curves, site plan etc. (h) the sbc of the soil is required to be given as per following table. calculation of bearing capacity will be governed generally as per is 8009 (pt-i) 1976, is-2720 (pt-ii) 1980, is 6403-1981, is 1904-1984 is 1904-1984 and is 1080-1985 and other relevant is code., (j) with every sites soil investigation report, a detailed site plan showing the approx location of each bore duly numbered as per log of bore hole should be enclosed. location of foundation of adjacent structures, especially those that might be impacted by the proposed construction. (k) every page of the soil investigation report should have the name of the job for which soil investigation is being carried out. in case of multiple sites of a single job are being investigated name of each site shall be put on each page of report pertaining to the site., (l) all pages of the soil investigation report shall be serially numbered, stamped and signed by the agency carrying out the soil investigation. report should be scrutinised by ge and cwe for correctness and endorse. (m) mobilisation of tools and equipments, machineries, manpowers etc to site location and demolition from site after completion of work.. While many public sector projects allow national competitive bidding, certain localized works require local offices or specific registration metrics in Gurgaon.

5.

Do I need an active GeM Portal registration to apply for this work?

If this procurement is routed through the central marketplace, an active GeM Seller ID is mandatory to supply items. Tender18 offers complete assistance for brand cataloging, profile creation, and vendor assessment required officially by Indian army

6.

What are the primary legal documents required to submit a valid bid?

To register an eligible bid for these contracts, companies must prepare their core compliance documents. Vendors operating across Haryana must ensure they possess a valid GST registration, permanent account number (PAN), and active Class-3 Digital Signature Certificates.

7.

What products or services are required for this active work?

This public procurement cycle is specifically looking for qualified vendors and suppliers who can provide high-quality solutions. The operational execution, delivery, and deployment of these materials must be managed locally within the Gurgaon region.

8.

Where can I review the estimated cost or budget details for this Tender?

The estimated project cost and budget thresholds can be reviewed directly inside the tender document. Bidders can analyze these qualification files to check if their firm meets the financial capability criteria specified for tender for soil investigation and sampling , borehole drilling and sbc analysis , soil laboratory testing physical , soil chemical analysis , soil engineering properties test , water level test , comprehensive soil report and sbc , foundation mapping , mobilization and final certification, soil investigation, to carry out soil investigation and collection of samples in all types of strata including distrubed, undistrubed soil sampling, conduction of standard penetration test (spt), visual classification at regular interval, determine the safe bearing capacity complete with field and laboratory tests on soil/ rock samples including trail pit 1.20m x 1.20m x 3.0m investigation to relevant specification of is 2131, is 6403, is 1498 is 2720, conducting soil investigation for the following - (a) 150mm dia meter bore holes as per is specification (b) bore hole. (i) depth of bore hole 15.00 mtr (core drilling by calyx rig) (ii) to suggest sbc for isolated footing 1.5x1.5, 2.0x2.0, 2.5x2.5 mtr at 1.5m, 2.0m, 2.5m depth strip depth strip footing of 1.5 2.0 mtr. (iii) water table (iv) expansive nature of soil with respect plasticity index (v) n value at 2.5m, 3.0m, 6.0m, 12.0m (vi) bore log of soil strata upto 15.0 mtr depth, (c) collection of distrubed and undistrubed soil sample at interval of 1.00 mtr at change of relevant specification of is 2720., (d) conduction lab test on distrubed soil sample at interval of 1.00 mtr or at change of strata or as per relevant is code. (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density, (e) conducting lab test on undistrubed soil sample as considered necessary according to relevant specification of is 2720 - (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density (vi) specific gravity (vii) free swell index and swelling property of soil (viii) organic matter in any soil, in any (ix) consolidation test (compressed index value) (x) trixial compression test and determination of shear parameters (construction of ) test as per relevant is. (xi) harful salt (complete investigation as already ref)., (f) ground water table - (i) maximum and minimum levels of ground water in the area with sources of information. (ii) ground water table during investigation., (g) submission of six copies of test reports with detailed description of field investigation, soil classification and general nature of soil strata, water table, interpretation of test results, grains size, distribution curves, compressive index curves, site plan etc. (h) the sbc of the soil is required to be given as per following table. calculation of bearing capacity will be governed generally as per is 8009 (pt-i) 1976, is-2720 (pt-ii) 1980, is 6403-1981, is 1904-1984 is 1904-1984 and is 1080-1985 and other relevant is code., (j) with every sites soil investigation report, a detailed site plan showing the approx location of each bore duly numbered as per log of bore hole should be enclosed. location of foundation of adjacent structures, especially those that might be impacted by the proposed construction. (k) every page of the soil investigation report should have the name of the job for which soil investigation is being carried out. in case of multiple sites of a single job are being investigated name of each site shall be put on each page of report pertaining to the site., (l) all pages of the soil investigation report shall be serially numbered, stamped and signed by the agency carrying out the soil investigation. report should be scrutinised by ge and cwe for correctness and endorse. (m) mobilisation of tools and equipments, machineries, manpowers etc to site location and demolition from site after completion of work. by Indian army

9.

How can I download the official BOQ file for this opportunity?

You can download the commercial Bill of Quantities (BOQ) spreadsheet directly using the secure link provided on this page. The BOQ file contains the item descriptions and rate filling forms officially validated for tender for soil investigation and sampling , borehole drilling and sbc analysis , soil laboratory testing physical , soil chemical analysis , soil engineering properties test , water level test , comprehensive soil report and sbc , foundation mapping , mobilization and final certification, soil investigation, to carry out soil investigation and collection of samples in all types of strata including distrubed, undistrubed soil sampling, conduction of standard penetration test (spt), visual classification at regular interval, determine the safe bearing capacity complete with field and laboratory tests on soil/ rock samples including trail pit 1.20m x 1.20m x 3.0m investigation to relevant specification of is 2131, is 6403, is 1498 is 2720, conducting soil investigation for the following - (a) 150mm dia meter bore holes as per is specification (b) bore hole. (i) depth of bore hole 15.00 mtr (core drilling by calyx rig) (ii) to suggest sbc for isolated footing 1.5x1.5, 2.0x2.0, 2.5x2.5 mtr at 1.5m, 2.0m, 2.5m depth strip depth strip footing of 1.5 2.0 mtr. (iii) water table (iv) expansive nature of soil with respect plasticity index (v) n value at 2.5m, 3.0m, 6.0m, 12.0m (vi) bore log of soil strata upto 15.0 mtr depth, (c) collection of distrubed and undistrubed soil sample at interval of 1.00 mtr at change of relevant specification of is 2720., (d) conduction lab test on distrubed soil sample at interval of 1.00 mtr or at change of strata or as per relevant is code. (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density, (e) conducting lab test on undistrubed soil sample as considered necessary according to relevant specification of is 2720 - (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density (vi) specific gravity (vii) free swell index and swelling property of soil (viii) organic matter in any soil, in any (ix) consolidation test (compressed index value) (x) trixial compression test and determination of shear parameters (construction of ) test as per relevant is. (xi) harful salt (complete investigation as already ref)., (f) ground water table - (i) maximum and minimum levels of ground water in the area with sources of information. (ii) ground water table during investigation., (g) submission of six copies of test reports with detailed description of field investigation, soil classification and general nature of soil strata, water table, interpretation of test results, grains size, distribution curves, compressive index curves, site plan etc. (h) the sbc of the soil is required to be given as per following table. calculation of bearing capacity will be governed generally as per is 8009 (pt-i) 1976, is-2720 (pt-ii) 1980, is 6403-1981, is 1904-1984 is 1904-1984 and is 1080-1985 and other relevant is code., (j) with every sites soil investigation report, a detailed site plan showing the approx location of each bore duly numbered as per log of bore hole should be enclosed. location of foundation of adjacent structures, especially those that might be impacted by the proposed construction. (k) every page of the soil investigation report should have the name of the job for which soil investigation is being carried out. in case of multiple sites of a single job are being investigated name of each site shall be put on each page of report pertaining to the site., (l) all pages of the soil investigation report shall be serially numbered, stamped and signed by the agency carrying out the soil investigation. report should be scrutinised by ge and cwe for correctness and endorse. (m) mobilisation of tools and equipments, machineries, manpowers etc to site location and demolition from site after completion of work. within the Haryana jurisdiction

10.

How can I find the submission closing date for this contract?

The official timeline and deadline details for tender for soil investigation and sampling , borehole drilling and sbc analysis , soil laboratory testing physical , soil chemical analysis , soil engineering properties test , water level test , comprehensive soil report and sbc , foundation mapping , mobilization and final certification, soil investigation, to carry out soil investigation and collection of samples in all types of strata including distrubed, undistrubed soil sampling, conduction of standard penetration test (spt), visual classification at regular interval, determine the safe bearing capacity complete with field and laboratory tests on soil/ rock samples including trail pit 1.20m x 1.20m x 3.0m investigation to relevant specification of is 2131, is 6403, is 1498 is 2720, conducting soil investigation for the following - (a) 150mm dia meter bore holes as per is specification (b) bore hole. (i) depth of bore hole 15.00 mtr (core drilling by calyx rig) (ii) to suggest sbc for isolated footing 1.5x1.5, 2.0x2.0, 2.5x2.5 mtr at 1.5m, 2.0m, 2.5m depth strip depth strip footing of 1.5 2.0 mtr. (iii) water table (iv) expansive nature of soil with respect plasticity index (v) n value at 2.5m, 3.0m, 6.0m, 12.0m (vi) bore log of soil strata upto 15.0 mtr depth, (c) collection of distrubed and undistrubed soil sample at interval of 1.00 mtr at change of relevant specification of is 2720., (d) conduction lab test on distrubed soil sample at interval of 1.00 mtr or at change of strata or as per relevant is code. (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density, (e) conducting lab test on undistrubed soil sample as considered necessary according to relevant specification of is 2720 - (i) sieve analysis (ii) atterbergs limits (iii) natural moisture content (iv) particle size analysis test (v) bulk density (vi) specific gravity (vii) free swell index and swelling property of soil (viii) organic matter in any soil, in any (ix) consolidation test (compressed index value) (x) trixial compression test and determination of shear parameters (construction of ) test as per relevant is. (xi) harful salt (complete investigation as already ref)., (f) ground water table - (i) maximum and minimum levels of ground water in the area with sources of information. (ii) ground water table during investigation., (g) submission of six copies of test reports with detailed description of field investigation, soil classification and general nature of soil strata, water table, interpretation of test results, grains size, distribution curves, compressive index curves, site plan etc. (h) the sbc of the soil is required to be given as per following table. calculation of bearing capacity will be governed generally as per is 8009 (pt-i) 1976, is-2720 (pt-ii) 1980, is 6403-1981, is 1904-1984 is 1904-1984 and is 1080-1985 and other relevant is code., (j) with every sites soil investigation report, a detailed site plan showing the approx location of each bore duly numbered as per log of bore hole should be enclosed. location of foundation of adjacent structures, especially those that might be impacted by the proposed construction. (k) every page of the soil investigation report should have the name of the job for which soil investigation is being carried out. in case of multiple sites of a single job are being investigated name of each site shall be put on each page of report pertaining to the site., (l) all pages of the soil investigation report shall be serially numbered, stamped and signed by the agency carrying out the soil investigation. report should be scrutinised by ge and cwe for correctness and endorse. (m) mobilisation of tools and equipments, machineries, manpowers etc to site location and demolition from site after completion of work. are available inside the detailed notification files. Bidders planning to target this contract in Gurgaon should check the official portal schedule early to complete their online technical and financial submission well before the closing hours.

Tender Inquiry